2.0 SUPPLY AND DELIVERY
The boiler is despatched to site as a pre
-
assembled and tested unit. Each boiler is delivered by a tail lift vehicle
and lowered to ground level. It is the installers responsibility to convey the boiler to the plantroom and to remove it
from the pallet.
NOTE
: The Upton boilers
MUST
not be stacked. When handling and manoeuvring the boiler care must be taken
to avoid damage to the casing. The flue system is packaged separately.
The boiler must be kept upright during handling.
The flue manifold connecting the vertical modules is supplied separately to the boiler .
Warranty
Full warranty assistance will be covered when the appliance is commissioned by Hamworthy Heating Ltd, see
Terms & Conditions for full details.
Hamworthy Heating Ltd will not accept any liability resulting from damage due to tampering, improper
use, handling, installation errors, operation and maintenance. It is important to check for damage upon
receipt of product, which if found must be notified to Hamworthy Heating Ltd immediately.
In the event of failure or breakdown, isolate the equipment and contact Hamworthy Technical Support
Tel
-
0845 450 2866
Figure 2.1
-
Boiler Packaging