HAMWORTHY HEATING LTD
16
UPTON FLOOR STANDING SERIES
500001340/C
4.5 Condensate Connections
•
Provision must be made for removal of condensate from the boiler and flue system.
•
If the flue system is longer than the standard length of 0.9m, an inline condense drain must be fitted
immediately before the connection of the flue system to the boiler and taken to drain.
•
Condense is mildly acidic, typically pH3
-
pH5.
•
Condense pipe work must be non
-
corrosive and not copper. Hamworthy recommend Polypropylene plastic
waste pipe.
•
Condense may be discharged to a standard drain subject to National or Local regulations.
•
Location of condense pipe work should prevent freezing within tundishes, traps and pipe work.
•
The connection to the boiler condense drain accepts a straight push
-
fit coupling for 34mm o.d. (1¼”)
Polypropylene plastic waste pipe.
•
Maximum condensate production
-
15 l/h per 100kW firing capacity
Figure 4.5.1
-
Boiler Condensate Connection
Open Tundish
Metal sheath to protect
plastic pipe
Minimum fall 50mm/m (1 in 50)
Содержание UF100-1
Страница 35: ...HAMWORTHY HEATING LTD 29 UPTON FLOOR STANDING SERIES 500001340 C Figure 9 3 1 Wiring Diagram...
Страница 63: ......