HAMWORTHY HEATING LTD
24
UPTON FLOOR STANDING SERIES
500001340/C
1.
Remove the flue gas sampling plug from the flue gas sample pipe, accessible from the front of the boiler and
insert the combustion analyser probe.
2.
Ensure that an insertion distance of 155mm is set on the combustion analyser probe.
NOTE: THIS DISTANCE MUST BE SET TO ENSURE ACCURATE ANALYSIS OF FLUE GASES.
3.
Insert probe horizontally into the flue gas sample pipe until depth stop is met.
Figure 8.5.1
-
Combustion Analyser Probe Setting
8.3 Ignition Controller Check.
1. With the burner firing, the flame signal should be at least 3µA. Refer to
separate Navistem manual
,
,
HHL part
no. 500001310.
To check for correct operation of the ignition controller, close the gas valve. The boiler should
shutdown after approximately one second and attempt a re
-
ignition. Check that the flame has been extinguished
2. Alternatively, the flame probe lead can be removed from the end of the flame probe, with the same result.
8.4 Gas Supply Pressure Check.
1. When the boiler modules have been checked for correct operation the gas supply pressure should be checked.
This should be done with all modules firing.
•
For Natural Gas, a nominal gas inlet pressure of 20mbar measured at the rear of the boiler is required, with
a maximum inlet pressure of 25mbar.
•
For LPG, a nominal gas inlet pressure of 37mbar measured at the rear of the boiler is required, with a
maximum inlet pressure of 45mbar.
8.5 Combustion Checks
“The boiler modules are factory pre
-
set, but site checks must be done to confirm correct performance.”
Figure 8.5.2
-
Insertion of Analyser Probe
Содержание UF100-1
Страница 35: ...HAMWORTHY HEATING LTD 29 UPTON FLOOR STANDING SERIES 500001340 C Figure 9 3 1 Wiring Diagram...
Страница 63: ......