4.0 SITE LOCATION AND PREPARATION
4.1 Site Location.
•
In the event that the boiler cannot be moved on a pallet truck, the four M8 bolts retaining the top cover can be
replaced with M8 lifting eyes and using suitable lifting slings hoisted into position.
IMPORTANT: lifting of single modules only is permitted by using the M8 lifting eye fixing positions provided.
DO NOT LIFT THE BOILER BY THE CASING PANELS!
•
The floor or plinth for the boilers and pipe work kit must be both flat and level to ensure correct alignment of fittings
and connections.
•
The floor or plinth must be sufficiently strong to support the weight of both the boilers and pipe work kit where used.
•
The floor or plinth must be fireproof in accordance with BS 6644.
•
The plant room must have sufficient space for installation of boilers, pipe work, pumps controls, flues ventilation,
access and servicing and other items of plant.
Figure 4.2
-
Gas Connection Point
Gas connection
M8 Lifting eye fixing positions.
Boiler Model
UF100/150
UF200/250
UF300/350
UF300/350
Stack size
3 high
2 high
3 high
2 high
3 high
2 high
3 high
2 high
Number of modules
12
12
6
12
Maximum output @ 20°C
Δ
T
MW
1.8
3.0
2.0
4.0
Maximum pressure
bar
6
Minimum pressure
bar
1.0
1.2
1.5
1.5
Maximum flow rate
Kg/s
21.5
35.8
25.1
50.2
Weights
Flow and return manifold kit
kg
207
156
282
212
317
235
351
270
Low loss header and pipe work
kg
131
124
336
325
336
325
438
416
Secondary circuit manifold kit
kg
59
106
106
158
Blanking flanges kit
kg
15
28
28
43
Water content
Flow and return manifold
l
36
27
65
50
65
50
87
73
Low loss header and pipe work
l
40
34
100
88
100
88
169
148
Figure 3.3
-
Pipe Kit Data