SPS Installation and Maintenance Manual
15
Figure 6. Battery Installation
6. Locate the orange wire with the inline fuseholder connected to the charge
controller. Connect this wire to the positive terminal of the first (closest)
battery.
7. Connect another orange wire with fuseholder from the positive terminal of
the first battery to the positive terminal of the second battery.
8. If a third battery is supplied with the product, connect another orange wire
with fuseholder from the positive terminal of the second battery to the
positive terminal of the third battery.
9. Locate the black battery wire. One end is connected to the charge
controller.
10. Connect this black wire to the negative terminal of the first battery.
11. Connect another black wire to the negative terminal of the first battery.
12. Connect the black wire from the first battery to the negative terminal of the
second battery, as shown in Figure 6.
13. If a third battery is supplied with the product, connect another black wire
from the negative terminal of the second battery to the negative terminal of
the third battery.
14. Inspect all battery connections for proper wiring. Tighten each battery
terminal bolt securely with a wrench.
4.3.6 Install the Fuses and Photocell
Proceed as follows to install the fuses:
1. This product has one 30 ampere fuse for each battery. Locate the fuses
(shipped with this manual).
Charge Controller
Содержание SPS Series
Страница 2: ...2 SPS Installation and Maintenance Manual ...