5. Locate the charge controller, as shown in Figure 12.
Figure 12. Charge Controller
6. Position the new charge controller near the old one. Remove the wires
from the terminal block on the old charge controller, one at a time, and
secure them to the same terminal on the new charge controller.
7. Remove the 4 mounting bolts from the old charge controller, and remove it
from the battery enclosure.
8. Attach the new charge controller to the battery enclosure with the 4
mounting bolts, and tighten securely.
9. Install the fuses, using the procedure described in Section 4.3.6.
10. Remove the temporary cover from the solar panel.
11. Perform the electrical checkout as described in Section 4.3.7.
12. Reinstall the battery enclosure cover.
6.5 Frangible Coupling Replacement
To replace the frangible couplings, perform the following steps:
1. Note: Always replace both frangible couplings at the same time. The
frangible couplings are unique for this product, and must be
obtained from Hali-Brite
®
.
2. Remove the battery enclosure cover, by reversing the procedure
described in Section 4.3.8.
3. Remove the battery fuses, by reversing the procedure described in
Section 4.3.6.
4. Disconnect the wind cone power cable, by reversing the procedure
described in Section 4.3.4.
5. Refer to Figure 13 to locate the frangible couplings and flanges.
Charge controller