Note 1:
For suction gas pipes, high pressure gas pipe and liquid pipes, gas pipe, flare connections shall be wrapped with
insulation materials (purchased locally) when their auxiliary insulation cylinders have been installed.
For installation of insulation materials for the flare
nut connections, it shall be cautioned that:
(1) Please connect it tightly so as to ensure no gas
leakage at both ends.
(2) The retaining clamp shall not be over tight so
as to ensure the thickness of the insulation
materials.
(3) Joints of insulation materials (purchased locally)
for the upper flare nut connections shall be
wrapped upwards.
(4) Ensure that joints of the insulation materials are
installed upwards. (See Fig.13.)
Fig.13
Auxiliary pipe
Seal
Valve box
Bind both ends with tie wire
Field pipe
side of the
insulation pipe
Tube side of vale box of the insulation pipe
Содержание MRV 5-RC AB052MAERA
Страница 1: ...MRV 5 RC Service Manual SYJS 03 2019REV A Edition 2019 03 ...
Страница 3: ......
Страница 55: ...52 AV08 10 12 14IMVURA 4 Center of gravity x X 347 9587 y 471 5454 z 725 6683 y z ...
Страница 56: ...53 AV16 18 20 22IMVURA x X 650 5962 y 380 7255 z 706 5342 y z ...
Страница 106: ...103 2 Dimension 4 19 200 60 25 25 25 249 108 232 84 69 388 73 82 65 103 177 4 44 4 35 277 ...
Страница 116: ...113 2 Preparation before installation ...
Страница 130: ...127 2 Dimension 290 67 410 220 567 137 160 189 57 144 109 159 159 212 393 4 22 65 65 65 65 65 44 65 76 4 52 67 156 830 ...
Страница 162: ...159 One by one valve box PCB code 0151800186A 2 Valve box PCB photo and dip switch setting ...
Страница 165: ...162 One by four valve box PCB code 0151800466 ...