121
(Note1):
Auxiliary pipe
-1,2,3: Install the flare nuts first and then use the auxiliary pipe after being flared in the field.
Fig.14
Fig.15
Fig.16
280B
The total capacity of the indoor unit in the downstream is more than 18.0 kW but less than 22.4 kW.
The total capacity of the indoor unit in the downstream is more than 22.4 kW but less than 28.0 kW.
Enlarge pipe
Flare nut (*2)
Gas pipe (*1)
Valve box (Top side)
Flare nut (*2)
HP gas pipe (*1)
Suction gas pipe (*1)
Liquid pipe (*1)
Auxiliary pipe
-3
Auxiliary pipe
-1
Auxiliary pipe
-1
Flare nut (*2)
Gas pipe (*1)
Liquid pipe (*1)
Flare nut (*2)
HP gas pipe (*1)
Suction gas pipe (*1)
Liquid pipe (*1)
Auxiliary pipe
-2
Auxiliary pipe
-2
Flare nut (*2)
Gas pipe (*1)
Liquid pipe (*1)
Valve box (Top side)
Содержание MRV 5-RC AB052MAERA
Страница 1: ...MRV 5 RC Service Manual SYJS 03 2019REV A Edition 2019 03 ...
Страница 3: ......
Страница 55: ...52 AV08 10 12 14IMVURA 4 Center of gravity x X 347 9587 y 471 5454 z 725 6683 y z ...
Страница 56: ...53 AV16 18 20 22IMVURA x X 650 5962 y 380 7255 z 706 5342 y z ...
Страница 106: ...103 2 Dimension 4 19 200 60 25 25 25 249 108 232 84 69 388 73 82 65 103 177 4 44 4 35 277 ...
Страница 116: ...113 2 Preparation before installation ...
Страница 130: ...127 2 Dimension 290 67 410 220 567 137 160 189 57 144 109 159 159 212 393 4 22 65 65 65 65 65 44 65 76 4 52 67 156 830 ...
Страница 162: ...159 One by one valve box PCB code 0151800186A 2 Valve box PCB photo and dip switch setting ...
Страница 165: ...162 One by four valve box PCB code 0151800466 ...