66
-
Then fit the reinforcement tube (3) with 2 hinged couplers (4).
-
Tighten the couplers (2) and (4) with a minimum torque of 50Nm.
Anchoring a vertical ladder mat against the support tubes on the mooring cylinders:
-
After the ladders have been slotted and locked together with the quick bolts, the ladder mat is
pressed against the support tubes previously installed on the mooring cylinders on various floors of
the building (1).
-
Position the ladder in relation to the façade, taking into account the accessory that will be used, in
order to guarantee free passage for the mobile equipment (2).
-
Stabilise the ladder mat against the support tubes of the mooring tubes on each floor with 2 fixing
clamps per support tube (3), then lock the assembly by tightening the fixing clamps (4).
Support tube
Reinforcement tube
Hinged
coupler
Hinged coupler
Orthogonal coupler
Содержание 312175001
Страница 14: ...14 SAFETY MARKINGS ON THE MACHINE WINCH BASE LADDER HEADBOARD ACCESSORIES...
Страница 18: ...18 ASSEMBLY EXAMPLES...
Страница 40: ...40 OVERLOAD OF THE DOUBLE TIPPING SKIP MAX PAYLOAD 150kg...
Страница 51: ...51 EXAMPLES OF INCLINED INSTALLATIONS OF THE HOIST ON THE FA ADE OF A BUILDING...
Страница 60: ...60 EXAMPLES OF VERTICAL INSTALLATIONS OF THE HOIST ON THE FA ADE OF A BUILDING...
Страница 67: ...67 1 1 2 2 2 1 4 4 3 3...
Страница 70: ...70...
Страница 75: ...75...
Страница 86: ...86 ELECTRICAL DIAGRAM OF THE ABM VF 200 250 WINCHES for MAXIAL EXCELLIUM and EXPERT...
Страница 87: ...87 DETAILS OF ELECTRICAL CONNECTIONS TO THE FREQUENCY CONVERTER...