82
-
A loose strand
-
A strand constriction or breakage
-
Flattening
-
Folding
-
Twisting
-
Crushing
-
Heat damage (burn marks, metal discoloration).
-
Lengthening of the cable or marked decrease in the diameter of the cable.
-
Knots or splices.
The cable must also be replaced if it has undergone:
- Fatigue after repeated bending, even under normal conditions of use.
- Overload (exceeding the rated load).
It is strictly forbidden to repair a lifting cable using couplers or
cable ties!
I If the hoisting rope is replaced, the replacement rope must have exactly the same
characteristics as the original rope.
If it is not wound correctly, block the trolley on the ladder, unwind the cable completely and then rewind it
with adjoining turns. This is very important to avoid premature wear and tear of the cable.
Perform this operation with two people, one handling the remote control and disabling the lower cable slack
safety device and one unwinding the cable, taking care not to leave the cable drum disordered.
During this action of unwinding the cable, be very careful not to press the "UP" button accidentally, because
the cable would then be wound up on the drum and could also wind your hand holding the end of the cable
towards the interior of the drum and cause serious injuries.
In all cases, the person who unwinds, handles and winds the hoisting cable must wear protective gloves
throughout these operations.
Clean and grease the lifting cable every day.
ACCESSORY TROLLEY PARACHUTE SYSTEM
Clean and grease every day.
Check that it is working properly before each use.
KNEE JOINT PULLEYS
Check for wear and tear (change if mark exceeds 5 mm),
Grease regularly, on average every week and systematically at each assembly.
Содержание 312175001
Страница 14: ...14 SAFETY MARKINGS ON THE MACHINE WINCH BASE LADDER HEADBOARD ACCESSORIES...
Страница 18: ...18 ASSEMBLY EXAMPLES...
Страница 40: ...40 OVERLOAD OF THE DOUBLE TIPPING SKIP MAX PAYLOAD 150kg...
Страница 51: ...51 EXAMPLES OF INCLINED INSTALLATIONS OF THE HOIST ON THE FA ADE OF A BUILDING...
Страница 60: ...60 EXAMPLES OF VERTICAL INSTALLATIONS OF THE HOIST ON THE FA ADE OF A BUILDING...
Страница 67: ...67 1 1 2 2 2 1 4 4 3 3...
Страница 70: ...70...
Страница 75: ...75...
Страница 86: ...86 ELECTRICAL DIAGRAM OF THE ABM VF 200 250 WINCHES for MAXIAL EXCELLIUM and EXPERT...
Страница 87: ...87 DETAILS OF ELECTRICAL CONNECTIONS TO THE FREQUENCY CONVERTER...