21
INSTALLATION OF WINCH 175 CA for MAXIAL PREMIUM
Move the winch to the back of the base ladder using the handle. Remove the
safety pin and the locking shaft, then rotate the locking handle downwards to
allow the winch to be fitted into the base ladder.
AGE
Remove the lower crossmember of the winch from the bottom rung of the base ladder and embed
the winch fully using the handle. As soon as the winch is
fully embedded, raise the locking handle to secure the winch, then insert the
locking shaft and the safety pin. The winch is ready to be connected.
Содержание 312175001
Страница 14: ...14 SAFETY MARKINGS ON THE MACHINE WINCH BASE LADDER HEADBOARD ACCESSORIES...
Страница 18: ...18 ASSEMBLY EXAMPLES...
Страница 40: ...40 OVERLOAD OF THE DOUBLE TIPPING SKIP MAX PAYLOAD 150kg...
Страница 51: ...51 EXAMPLES OF INCLINED INSTALLATIONS OF THE HOIST ON THE FA ADE OF A BUILDING...
Страница 60: ...60 EXAMPLES OF VERTICAL INSTALLATIONS OF THE HOIST ON THE FA ADE OF A BUILDING...
Страница 67: ...67 1 1 2 2 2 1 4 4 3 3...
Страница 70: ...70...
Страница 75: ...75...
Страница 86: ...86 ELECTRICAL DIAGRAM OF THE ABM VF 200 250 WINCHES for MAXIAL EXCELLIUM and EXPERT...
Страница 87: ...87 DETAILS OF ELECTRICAL CONNECTIONS TO THE FREQUENCY CONVERTER...