background image

1

Find the access door [2] at the bottom of the

control cabinet [1].

Open the access door.

Install the conduit bracket [3] to the bottom of

the control cabinet.

Use (2) screws to attach the bracket.

2

Find the cable conduit [2] under the bar feeder.

Put the cable conduit through the hole [1] in the

side of the lathe enclosure.

Note:

Some lathes do not have the hole. If the

lathe does not have a hole, make one with a 2.0"

(51 mm) hole saw. No hole is necessary for the

ST-10.

Put the conduit through the conduit bracket [3].

Push the conduit [5] up through the cable exit [4]

in the bottom of the control cabinet.

3

Open the control cabinet.

Danger:

If the voltage indicator light is on, do

not touch the electrical components. The high

voltage in the control cabinet can kill you. Wait for

the voltage indicator LED to go off fully.

Find the location on the amplifier bank that has

the "BAR FEEDER /W AXIS" label [1].

Install the 30-Amp servo amplifier [2], included

with the bar feeder, into that location.

Haas Bar Feeder - Installation - NGC - AD0406

Page 5 of 13 pages

Содержание Bar Feeder

Страница 1: ... 2030 or higher Haas Bar Feeder installation kit ST 10 15 20 25 30 35 NGC lathes built after Jan 14 2019 are equipped with I O PCB 34 3490B This I O PCB does not have the circuitry to power the Bar feeder DC motor Bar feeders built after Jan 14 2019 will have a tool changer PCB kit included in the bar feeder electrical installation kit If you receive a bar feeder that does not have the tool change...

Страница 2: ...Haas Bar Feeder Installation Haas Bar Feeder Installation NGC AD0406 Page 2 of 13 pages ...

Страница 3: ...INSTALLATION 2 Put the bar feeder adjacent to the lathe Make sure the frame ends 1 are parallel to the front 2 of the lathe Remove the shipping brackets 3 from the frame of the bar feeder 3 Pull the bar feeder 1 forward until it locks into position Find the end of the bar feeder 2 If the lathe is an ST 35 find the end of the coolant collector extension 3 If the lathe is an ST 10 ST 15 ST 20 ST 25 ...

Страница 4: ...Haas Bar Feeder Electrical Installation Haas Bar Feeder Installation NGC AD0406 Page 4 of 13 pages ...

Страница 5: ...hole saw No hole is necessary for the ST 10 Put the conduit through the conduit bracket 3 Push the conduit 5 up through the cable exit 4 in the bottom of the control cabinet 3 Open the control cabinet Danger If the voltage indicator light is on do not touch the electrical components The high voltage in the control cabinet can kill you Wait for the voltage indicator LED to go off fully Find the loc...

Страница 6: ...installation kit between these terminals Connect the black wire to H V Connect the red wire to H V Install a ferrite filter P N 64 1252 bead around the red white black cables going to the bar feeder motor 5 Connect the current command cable included with the bar feeder to the connector 1 at the top of the amplifier Connect the other end of the cable Connect to channel 10 P10 2 on the Maincon PCB F...

Страница 7: ...e 34 349x I O PCB Note Bar Feeders built after January 14 2019 will have a Tool Changer PCB kit included in the electrical kit Install the TC PCB on the standoffs Connect cable P N 33 0413 from J1 2 on the TC PCB to P74 3 on the I O PCB Connect cable P N 33 0412 from P55A 4 on the TC PCB to P55 5 on the I O PCB Connect cable P N 33 0349 from P4 on PSUP PCB to the P55 7 on the TC PCB Connect the ba...

Страница 8: ...Haas Bar Feeder Alignment Haas Bar Feeder Installation NGC AD0406 Page 8 of 13 pages ...

Страница 9: ...tab Set parameter 13 078 BF TOOL CHANGE OFFSET Activate the bar feeder in the Settings page Change setting 336 Bar Feeder Enabled to ON Zero return the machine 1 Look at the transfer table 1 on the bar feeder The groove in the transfer table aligns with the spindle adaptor Tap the frame ends 2 with a rubber mallet 3 to move the bar feeder Haas Bar Feeder Installation NGC AD0406 Page 9 of 13 pages ...

Страница 10: ...ind the 8 cart screws 5 Each side of the bar feeder has 4 screws Loosen the 8 screws Put the adjustment tool 2 into the socket 5 Release the EMERGENCY STOP Press RESET to stop each alarm Press RECOVER to enter the bar feeder recovery mode Press F2 to load the push rod The pusher clears the tray then the push rod assembly moves down Press EMERGENCY STOP Use your hand to move the push rod actuator 1...

Страница 11: ...until the center of the push rod aligns with the center of the spindle Note Gravity pulls the end of the push rod down a small distance Tap the frame ends with a rubber mallet to move the bar feeder from side to side if necessary Return the push rod to its home position 8 Step on the release pedal Push the bar feeder backward to the end of its travel If the bar feeder is correctly leveled the gas ...

Страница 12: ...ach foot Note Turn the feet to the sides of the bar feeder to avoid a tripping hazard Drill 2 a Ø 0 50 13 mm hole in each mark Drill the hole to a depth of 2 0 51 mm 3 Put the foot 3 over the hole 4 Put an anchor 2 into the hole Use a hammer 1 to tap the anchor Tap the anchor until it is at the bottom of the hole Put a washer 6 and a nut 5 on the bolt Torque each nut to 55 ft lb 75 Nm Haas Bar Fee...

Страница 13: ...overy mode Place a precision ground calibration bar with a known length on the charging table Press ORIGIN type in the length of the calibration bar and press ENTER The pusher clears the tray then loads the calibration bar It will then measure the length of the bar and apply the calibration Remove and properly store the calibration bar for future use A bar feeder only needs calibration at installa...

Отзывы: