©
Guldmann
GB
-1394/11/08
4.
e
le
ct
rI
ca
l
co
n
n
ec
tI
o
n
Charging kit for room-covering
mini-maxi-jumbo rail with GH2
1 . Prepare the travelling trolley with power pick-up .
2 . Fit the charging house in the parallel rail and connect
it to the charger via the cable connector .
3 . Install the charging house/station on the traverse rail .
4 . Fit the wire from the power pick-up on the travelling
trolley to the cable connector from the charging house
on the traverse rail .
Note:
When using DC/charger the po to +
must
be
respected . (+ is the right side when the hoist is run
into
the charging station) .
5 . Mark the charging station with red battery labels .
6 . Size the power pick-up to fit the mini-, maxi- and
jumbo-rails .
7 . Adjust the length of the 110-240 V wire .
Charging systems
Содержание GH2
Страница 2: ......
Страница 4: ......
Страница 10: ...Bla bla Guldmann GB 1394 11 08 12 ...
Страница 34: ...Bla bla Guldmann GB 1394 11 08 36 ...
Страница 73: ...Bla bla Guldmann GB 1394 11 08 75 4 electrical connection Interconnection diagram GH2 twin ...
Страница 87: ...Bla bla Guldmann GB 1394 11 08 89 ...
Страница 88: ... Guldmann GB 1394 11 08 90 5 control Control 5 Checkliste 88 ...
Страница 90: ... Guldmann GB 1394 11 08 92 6 toolbox ToolS 6 Overview of tools for rail installation 93 ...
Страница 93: ... Guldmann GB 1394 11 08 95 7 service GH2 Service manual ...
Страница 107: ... Guldmann GB 1394 11 08 109 7 service Periodic Inspection ...
Страница 108: ......
Страница 109: ......