Guldmann
GB
-1394/11/08
4
3.
I
n
st
al
la
tI
o
n
Rail systems should be installed in such a way as to
make it possible to take down hoists and traverse
travelling trolleys so that they can be serviced .
This is particularly the case in connection with systems
that are built into ceilings so that it is impossible to remove
brackets .
Rails with milled grooves for removing the hoist are
available .
To remove the transverse travelling trolley from the rail
there must be at least 60 mm (2
3
/
8
") of space from the
track end to the wall on the end where the charging pick-
up is fitted .
As an alternative, the rail can be cut at an angle of
45° – 60 mm x 60 mm (2
3
/
8
" x 2
3
/
8
") .
NB!
Rails with milled grooves, rails at a distance of 60 mm
(2
3
/
8
") from the wall, or rails cut off at 45° must be placed
at the same end as the charging pick-up on the traverse
travelling trolley .
Taking down hoists and travelling trolleys
Содержание GH2
Страница 2: ......
Страница 4: ......
Страница 10: ...Bla bla Guldmann GB 1394 11 08 12 ...
Страница 34: ...Bla bla Guldmann GB 1394 11 08 36 ...
Страница 73: ...Bla bla Guldmann GB 1394 11 08 75 4 electrical connection Interconnection diagram GH2 twin ...
Страница 87: ...Bla bla Guldmann GB 1394 11 08 89 ...
Страница 88: ... Guldmann GB 1394 11 08 90 5 control Control 5 Checkliste 88 ...
Страница 90: ... Guldmann GB 1394 11 08 92 6 toolbox ToolS 6 Overview of tools for rail installation 93 ...
Страница 93: ... Guldmann GB 1394 11 08 95 7 service GH2 Service manual ...
Страница 107: ... Guldmann GB 1394 11 08 109 7 service Periodic Inspection ...
Страница 108: ......
Страница 109: ......