A
B
E
F
D
C
©
Guldmann
GB
-1394/11/08
6
4.
e
le
ct
rI
ca
l
co
n
n
ec
tI
o
n
Installation of the Combi-lock
Motor unit is installed as described on page 63 .
Installing the safety lock on fixed rail
• The motor unit with tongue and the safety lock for the
fixed rail are pushed together into the T track in the Mini
rail .
• The safety lock should be installed so that its edge is
flush with the front edge of the rail .
• Fasten the safety lock with two M4 x 10 locking screws .
• Use the safety lock as a drill gauge and hold it precisely
in position while drilling . A screw clamp can also be
used to keep the safety lock in position while drilling .
Bottom of safety lock
must
fit tightly against bottom of
rails .
• Drill the holes and make the M4 threads . Clean up
components and mount the screws .
• Tighten the motor house . Ensure that the sliding bolt is
pulled no more than 2 mm (
3
/
16
") back from the front
edge of the rail when it is mechanically pulled back
to its rearmost position .
• Install bracket for Combi-lock . Before finally fastening
the bracket, check that the rail is level, both horizontally
and vertically . If necessary, adjust the bracket .
A .
100 mm
(4")
B . std .
100-400 mm
(4" – 16")
B . max
1350 mm
(54")
C .
200 mm
(8")
D .
58 mm
(2
5
/
16
")
E . min
115 mm
(4
9
/
16
")
F . min
255 mm
(10
5
/
16
")
Installing the safety lock on traverse rail
• Loosen the M8 nuts in the T track plate so that the
safety lock can be pushed into the T track of the rail .
• The safety lock must be level with the track end .
• When the safety lock has been correctly installed,
the two M8 nuts can be tightened .
• Check that there is a space of minimum 1 mm (
1
/
16
")
from the activation pin in the T track to the bottom of
the T track .
• Fasten the safety lock with one M4 x 10 locking screw .
• Use the safety lock as a drill gauge .
• Drill the holes and make the M4 threads . Clean up
components and mount the screws .
Important
After installation has been completed, check that the locks
work in combination, i .e . they open and close correctly
individually .
All parts have been lubricated from the factory . Do not
lubricate or grease any components or rails
Combi-lock
CL electrically operated
Содержание GH2
Страница 2: ......
Страница 4: ......
Страница 10: ...Bla bla Guldmann GB 1394 11 08 12 ...
Страница 34: ...Bla bla Guldmann GB 1394 11 08 36 ...
Страница 73: ...Bla bla Guldmann GB 1394 11 08 75 4 electrical connection Interconnection diagram GH2 twin ...
Страница 87: ...Bla bla Guldmann GB 1394 11 08 89 ...
Страница 88: ... Guldmann GB 1394 11 08 90 5 control Control 5 Checkliste 88 ...
Страница 90: ... Guldmann GB 1394 11 08 92 6 toolbox ToolS 6 Overview of tools for rail installation 93 ...
Страница 93: ... Guldmann GB 1394 11 08 95 7 service GH2 Service manual ...
Страница 107: ... Guldmann GB 1394 11 08 109 7 service Periodic Inspection ...
Страница 108: ......
Страница 109: ......