A
B
C
D
E
F
Blue
Red
White
Green
Charge
NR 934001
Motor
1
P1
1 2
2
X1
X3
NR 934036
Motor
2
Brown
Blue
Brown
Blue
A
B
3
4
©
Guldmann
GB
-1394/11/08
60
4.
e
le
ct
rI
ca
l
co
n
n
ec
tI
o
n
Installing the motor control PCB in the DC traverse
travelling trolley
• Put the motor control PCB into the cover on motor 2 .
Two wires, measuring 2 x 0 .75 mm² must be drawn
through the traverse rail and connected to the motor
control PCB (A) and motor 2 to the main PCB (B) .
• Connect the motor control PCB (A), position x1 to PCB
B via positions 1 and 2 on the terminal board .
• Remove the brown and blue wires from motor 1 from
terminal boards 1 and 2 and connect them to motor 2,
position 3 on the motor control PCB via the wire in the
traverse rail .
• Speed can be regulated by turning P1 anti-clockwise .
• If the motors run in different directions, reverse the wires
to motor 2 in plug x3 .
Traverse drive motor
Содержание GH2
Страница 2: ......
Страница 4: ......
Страница 10: ...Bla bla Guldmann GB 1394 11 08 12 ...
Страница 34: ...Bla bla Guldmann GB 1394 11 08 36 ...
Страница 73: ...Bla bla Guldmann GB 1394 11 08 75 4 electrical connection Interconnection diagram GH2 twin ...
Страница 87: ...Bla bla Guldmann GB 1394 11 08 89 ...
Страница 88: ... Guldmann GB 1394 11 08 90 5 control Control 5 Checkliste 88 ...
Страница 90: ... Guldmann GB 1394 11 08 92 6 toolbox ToolS 6 Overview of tools for rail installation 93 ...
Страница 93: ... Guldmann GB 1394 11 08 95 7 service GH2 Service manual ...
Страница 107: ... Guldmann GB 1394 11 08 109 7 service Periodic Inspection ...
Страница 108: ......
Страница 109: ......