![GST GST5000 Скачать руководство пользователя страница 29](http://html1.mh-extra.com/html/gst/gst5000/gst5000_installation-and-operation-manual_2275591029.webp)
GST5000 Intelligent Fire Alarm Control Panel
Installation and Operation Manual (Generic Part)
The Intelligent Solution
Page 24
Press
SYSTEM
to enter system setting menu and choose “3.Working state setup“ (Fig.
4-10):
Fig. 4-10
Press “
△
=
” or “
=
▽
” to make the cursor point to “2.Commissioning State”, and press
ENTER
to enter commission state. The screen like Fig. 4-11 will be shown on the
LCD.
Fig. 4-11
Step Two: In commission state, re-start the FACP.
GST5000 FACP will automatically register devices. Please check the number of devices
registered, programming, and operation state comply to design requirement, and
remove any problem.
4.6 Definition of Devices
Please define devices and C&E equation by configuration software GSTDef2.0 via a PC,
Ver V4.05f
Working state setup
1. Monitoring State
2. Commissioning State
INSTALLER Ver 1.5
System running
Содержание GST5000
Страница 1: ......