
Pellet burner GP 45 IV 42
Installation of the fire-grate can be completed in two steps:
The fire-grate has to be positioned so its legs contact the bottom of the burner’s main
module combustion head;
Move the fire-grate so it completely fits the combustion head of the main module.
6.10. INTRODUCING THE USER WITH THE MAINTENANCE AND ADJUSTMENT
PROCEDURES OF PELLET BURNER FROM SERIES “GP”.
It is required that the users are well introduced, in details, to the presented manual for
operation of the burner, as well as to its operation, adjustment of the heating output level and
the maintenance methods.
The combustion chamber cleaning from the ash deposits has to be performed periodically (at
least once per day or at longer periods, depending on the fuel’s ash content, but no longer
than 5 days of operation). The customer must shut down the burner by observing the
instructions described in the above topics. This ensures effective fuel after burning and
cooling of the combustion chamber. After cooling of the burner the ash residues have to be
cleaned by using personal safety equipment and proper tools – working gloves, putty-knife.
Figure 6.21. A pair of working gloves, granted for easier and safer cleaning of the burner’s
main module.
The flexible pellets feeding pipe has to be cleaned also, because during transportation of the
pellets dust deposits could gather in the pipe, which might lead to difficult fuel supplying and
to firing of the dust, in case of emergency situations caused by the penetration of hot flue
gasses through it.
How to restart the burner – after removing the normal operation fault cause the burner
restoring to operation can be achieved by switching off and then on (restarting) its main
power supply.