![Gree R410A Скачать руководство пользователя страница 103](http://html.mh-extra.com/html/gree/r410a/r410a_service-manual_2260090103.webp)
Super Free Match
Service Manual
INSTALLATION
99
5.3
Combinations for Outdoor and Indoor Units
Sorts FXB3A-K
FXB5A-K
Min 1
1
No. of connectable BU modules for
each outdoor unit
Max 3
3
Min 1
1
No. of connectable indoor units
Max 3
5
5.4
Selection of Installation Location
The BU module is for indoor use.
The
BU module must be installed on a firm and solid support
which can withstand the weight of the
module and the mounting surface must be horizontal plane. The BU module can be chosen to install in
the ceiling,
such as the ceiling of parlor, corridor, balcony,
storeroom
and etc
There is enough space for the installation and maintenance.
Avoid direct sunlight or other heat sources exist
Do not install in location that is hot or humid for long periods of time.
Avoid the BU module installed in the bedroom and study, where these places need to be quiet
BU module cannot be installed in the place of inflammable and explosive materials and severe dust,
smoke and the other air pollution, such as the kitchen.
There is enough space to install drainage pipe, so that the condensed water can be discharged.
Caution!
Installation at the following places might lead to the air conditioner malfunction. If it is unavoidable, please
contact the appointed service center.
A place which is full of machine oil;
A region with saline-sodic soil near the sea;
A place where the sulphide fog exists, such as the sulphur spring;
A place where the high frequency facilities exist, such as radio equipment, electric welder and medical
equipment;
An environment with special conditions.
Содержание R410A
Страница 1: ...SUPER FREE MATCH SERIES SERVICE MANUAL T1 R410A 50Hz GC201306 CENTRAL AIR CONDITIONERS ...
Страница 5: ...Super Free Match Service Manual PRODUCT 1 PRODUCT ...
Страница 28: ...Super Free Match Service Manual CONTROL 24 CONTROL ...
Страница 29: ...Super Free Match Service Manual CONTROL 25 Control 1 OPERATION FLOWCHART ...
Страница 31: ...Super Free Match Service Manual CONTROL 27 1 2 Heating Operation ...
Страница 66: ...Super Free Match Service Manual INSTALLATION 62 INSTALLATION ...
Страница 97: ...Super Free Match Service Manual INSTALLATION 93 ...
Страница 118: ...Super Free Match Service Manual INSTALLATION 114 7 Electrical Wiring Work 7 1 Wiring Connection Precept 1 Precept 2 ...
Страница 129: ...Super Free Match Service Manual MAINTENANCE N 125 MAINTENANCE ...
Страница 152: ...Super Free Match Service Manual MAINTENANCE 148 5 Console GEH 09 AA K3DNA1C I GEH 12 AA K3DNA1C I GEH 18 AA K3DNA1C I ...
Страница 153: ...Super Free Match Service Manual MAINTENANCE N 149 4 2 3 BU module FXB3A K ...
Страница 154: ...Super Free Match Service Manual MAINTENANCE 150 FXB5A K ...
Страница 203: ...Super Free Match Service Manual MAINTENANCE N 199 7 2 3 Cassette type GKH 12 BA K3DNA2A I GKH 18 BA K3DNA2A I ...
Страница 217: ...JF00301896 ...