GL820-UM-251-9370
4-5
4. SETUP PROCEDURES
Setup procedure
(1) As shown in the figure above, connect the output of the voltage generator to the GL820’s CH1 input
terminal.
(2) Leave the GL820 turned on for at least
30 minutes
. And leave the GL820 turned on for at least
10
minutes
after wiring.
(3) After entering the System Setup mode, open the Setup menu as shown below.
Specify the AMP Setup conditions as shown below.
Mode
:Setup1 (Basic)
CH
:CH 1
(4) Move the cursor to the “Execute Setup” position as shown below.
Содержание GL820
Страница 1: ...midi LOGGER SERVICE MANUAL 820 GL820 UM 251 GL820 UM 251 02 9370 ...
Страница 2: ......
Страница 8: ...GL820 UM 251 9370 1 2 1 CONFIGURATION ...
Страница 12: ......
Страница 35: ...GL820 UM 251 9370 4 15 4 SETUP PROCEDURES 13 Turn off the GL820 This completes the RTD temp setup ...
Страница 36: ......
Страница 56: ......