BOTTOM BRIDGE RAIL
TOP BRIDGE RAIL
AND 5/16" WASHERS
POSTS ON EACH SIDE WITH
5/16" X 3-1/2" LAG SCREWS
REMOVED FROM VIEW
FOR CLARITY.
ATTACH TOP AND LOWER
BRIDGE RAILS TO CORNER
NOTE: SOME BOARDS
ATTACH
5/4 X 3 X 28-1/4"
PANEL SLAT
WITH 2" WOOD SCREWS
16"
59"
STEP 14: BRIDGE RAILS TO PLAY SET
1: PLACE THE BRIDGE RAILS AGAINST THE GREEN CORNER POST AND CENTER CORNER POST ON
THE PLAY SET.
2: LEVEL EACH TOP BRIDGE RAIL AND ATTACH THEM TO THE CORNER POSTS WITH 5/16" X 3-1/2"
LAG SCREWS AND 5/16" WASHERS.
3: MAKE THE BOTTOM OF EACH LOWER BRIDGE RAIL 16" FROM THE TOP OF THE TOP BRIDGE RAIL.
4: ATTACH EACH LOWER BRIDGE RAIL TO THE CORNER POSTS WITH 5/16" X 3-1/2" LAG SCREWS
AND 5/16" WASHERS.
5: ATTACH 5/4 X 3 X 28-1/4" PANEL SLAT TO ROPE LADDER SUPPORT AND FRONT FACE BOARD,
NEXT TO THE BRIDGE RAIL WITH 2" WOOD SCREWS.
154
Содержание 1500KWR
Страница 6: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 52: ...WAVE SLIDE 03 0013 RAD RIDE SLIDE 03 0002 PICTURE DESCRIPTION QTY 1 1 1 SUPER SCOOP 03 0007 44...
Страница 55: ...IRON DUCTILE SWING HANGER 11 4012 DESCRIPTION PICTURE QTY 6 BRACKET 4 11 4003 GREEN 11 5013 90 SPRING CLIP 6 47...
Страница 59: ...DESCRIPTION PICTURE QTY 07 0005 2 ONE BAG 6 SAFETY HANDLE 2 HANDLES ARE IN 96 CHAIN SECTION 51...
Страница 148: ...PART II CLATTER BRIDGE 140...
Страница 177: ...APPENDIX 169...