background image

_^=riqfj^qb

båÖäáëÜ

léÉê~íáåÖ=fåëíêìÅíáçåë

_^=SVR=aÉåí~ä=^áê=qìêÄáåÉ=e~åÇéáÉÅÉ=

_^=SUU

Operating instructions / 04/05 BA 695 \rBA 688 / with fixed connection

6556067_EN.book  Seite 1  Montag, 27. November 2017  12:27 12

Содержание BA ULTIMATE 695

Страница 1: ..._ riqfj qb b l f _ SVR a q e _ SUU Operating instructions 04 05 BA 695 rBA 688 with fixed connection 6556067_EN book Seite 1 Montag 27 November 2017 12 27 12...

Страница 2: ...egin 5 1 1 Structure of the document 7 1 2 Service life 10 2 Safety information 11 3 Technical description 13 3 1 Task 13 3 2 Design of the BA ULTIMATE 14 3 3 Technical data 15 3 4 Turbine connection...

Страница 3: ...ng the work day 21 4 3 Before each patient 22 5 Operation 23 5 1 Replacing the turbine 24 5 2 Inserting and removing burs 27 5 3 Adjusting the cooling spray 29 6 Follow up 31 6 1 After each treatment...

Страница 4: ...Automated cleaning and disinfecting 34 7 3 Manual cleaning and disinfection 36 7 4 Manual maintenance 38 7 5 Sterilizing 44 8 Maintenance 46 8 1 Testing the FG clamping system 46 8 2 Replacing the ha...

Страница 5: ...ndards The units the product is connected to must comply with the requirements of IEC 60601 1 1 Read the operating instructions before using the BA 695 BA 688 turbine 2 Use the BA 695 BA 688 turbine o...

Страница 6: ...d injuries Rotating_without bones The treatment involves the rotary processing of hard and soft tooth substance and dental prostheses crowns fillings bridges etc Contraindications None Target group Th...

Страница 7: ...revent injuries please observe the warnings Warnings are labeled as follows DANGER indicates a danger leading to death or serious injury if not avoided WARNING indicates a danger that may lead to deat...

Страница 8: ...please observe all instructions for use Instructions for use are labeled as follows NOTICE indicates measures for the prevention of material damage IMPORTANT indicates information on the avoidance of...

Страница 9: ...ment have the following meaning Prerequisite 1 First action step 2 Second action step or Alternative action Result Individual action step Requests you to do something Use of formats and symbols 9 Iden...

Страница 10: ...No warranty claim can be inferred here as wear may occur earlier or later than indicated above depending on use frequency of sterilization and frequency of maintenance Replacing elastomers Elastomers...

Страница 11: ...r further reference Preventing the spread of infections and cross contamination Sterilization Prevent the spread of infections and cross contamination between patients users and third parties Steriliz...

Страница 12: ...embled by third parties In the case of service or repair work please send the instrument in an assembled state to B A International Ltd or to a service center approved by B A International Spare and a...

Страница 13: ...echnical description 3 1 Task The BA 695 BA 688 high speed handpiece is used to power dental instruments with an FG shank The quick coupling is used for media supply and connection to the supply hose...

Страница 14: ...TE 14 65 56 067 D3560 201 09 03 02 3 2 Design of the BA ULTIMATE A Turbine head in this case Power B Push button C Cooling spray outlet D Opening of chuck system E Light aperture F Handpiece sleeve 65...

Страница 15: ...15 3 3 Technical data Turbine BA 695 BA 688 Available head sizes Power 22W Mini 19W Light function x x Back suction stop in the head housing x x Back suction stop in the spray water area x x Pushbutto...

Страница 16: ...ad Friction grip burr instrument Power Mini No load speed in rpm 360 000 10 400 000 10 Maximum torque in Nmm 2 0 1 6 Power Mini Shank standard ISO 1797 1 ISO 1797 1 Shank diameter in mm 1 59 1 60 1 59...

Страница 17: ...Treatment center BA 695 BA 688 Driving air pressure in bar flowing dry and clean 2 7 Driving air consumption in Nl min 48 5 Return air pressure in bar 0 3 Spray air pressure in bar 2 7 Spray air flow...

Страница 18: ...MATE 18 65 56 067 D3560 201 09 03 02 3 4 Turbine connection types available Connection type available for R F quick coupling Sirona Multiflex LUX KaVo quick coupling ROTO QUICK W H quick coupling 6556...

Страница 19: ...ions BA ULTIMATE 3 Technical description 65 56 067 D3560 201 09 03 02 19 Unifix L Bien Air quick coupling PTLCL NSK quick coupling Connection type available for 6556067_EN book Seite 19 Montag 27 Nove...

Страница 20: ...6 067 D3560 201 09 03 02 3 5 Production data HSI HIBC code H658 M 675LN 1 S 07 00001 A B C A Product label code in this case 675LN 1 B Year of manufacture in this case 2007 C Serial number in this cas...

Страница 21: ...res are set 15 If necessary have the pressures checked by a service engineer with a star tester that is placed between the supply hose and the quick coupling Sterilize the turbine and accessory parts...

Страница 22: ...ment 27 4 Set a sufficient amount of cooling water 50 ml min 29 5 Use filtered water only 50 m 6 Check the nozzles for blockages and lime deposits for example and clean the nozzles if necessary CAUTIO...

Страница 23: ...nt is inserted at least 10 mm and is clamped securely in place CAUTION Insufficient cooling leads to overheating of the preparation site and damage to the tooth substance Ensure that the water content...

Страница 24: ...ng 5 1 1 Turbine with Sirona or KaVo connection Attaching the turbine Insert the turbine until it audibly clicks into place Removing the turbine The turbine is at a standstill Hold the quick coupling...

Страница 25: ...Insert the turbine until it audibly clicks into place Removing the turbine The turbine is at a standstill Press the markings A of the W H quick coupling or the pushbuttons B on the Bien Air quick cou...

Страница 26: ...he turbine Insert the turbine until it audibly clicks into place Removing the turbine The turbine is at a standstill Slide back the sleeve A on the quick coupling toward the supply hose and pull the t...

Страница 27: ...polishers that are sharp and undamaged Use clean burs and diamond polishers to avoid dirt in the clamping system CAUTION A loose or partially removed bur instrument can detach itself from the head or...

Страница 28: ...n grip bur The turbine is at a standstill 1 Press the button and insert the bur up to the stop 2 Pull on the bur to check that it is firmly attached Removing the friction grip bur The bur must not be...

Страница 29: ...F quick coupling Quick coupling R F Dentsply Sirona The maximum water flow is set when the control ring clicks into place KaVo quick coupling Multiflex LUX quick coupling KaVo The maximum water flow i...

Страница 30: ...low is set when the control ring is rotated right to the stop The maximum flow is set when the control ring is rotated left to the stop NSK PTL CL quick coupling PTL CL quick coupling NSK The water fl...

Страница 31: ...e bur instrument must not be moving Wear appropriate protective clothing 1 Purge the water and air channels on the treatment center for 30 seconds 2 Remove the bur instrument with tweezers 3 Pre disin...

Страница 32: ...nditioning 34 Manual conditioning 36 is possible in exceptional cases if the national local regulations are followed 7 Spray the turbine 38 8 Sterilize the turbine and the accessories 44 6 2 At the en...

Страница 33: ...y and have proven bactericidal fungicidal and virucidal properties Only use disinfectants with no protein fixing properties 1 Spray the surface with disinfectant 2 Wipe the disinfectant off with a clo...

Страница 34: ...cleaning and disinfection equipment used must be approved by its manufacturer for the cleaning and disinfection of dental instruments and comply with EN ISO 15883 1 e g 95 C 203 F and 10 min holding...

Страница 35: ...should be dry and free of residue 3 Blow BA 695 BA 688 out with max 3 bar 4 Maintain mechanical parts manually 38 5 Maintain the push button chuck manually 41 6 Pack BA 695 BA 688 in packaging materia...

Страница 36: ...r after treatment NOTICE Never clean in an ultrasound bath NOTICE Never immerse in disinfectant solution NOTICE Using sprays from other manufacturers can reduce the product s service life Only use BA...

Страница 37: ...pters according to manufacturer s instructions e g with WL Clean made by ALPRO 4 Blow spray channels with suitable adapters out with 2 5 3 bar until no more moisture displaces but at least 10 seconds...

Страница 38: ...anual maintenance 7 4 1 Maintenance of mechanical parts Intervals At least every noon and evening Prior to each sterilization After every thermal disinfection without integrated maintenance During a l...

Страница 39: ...rs can reduce the product s service life Only use BA Ultimate Spray A F E D C B ULTIMATE SPRAY BA A Sirona connection spray adapter B KaVo connection spray adapter C W H connection spray adapter D Bie...

Страница 40: ...Fit the spray adapter onto the nozzle of the spray can 2 Insert the high speed handpiece as far as it will go and hold it in place 3 Spray into the turbine for 1 2 seconds IMPORTANT Hold the spray can...

Страница 41: ...re of the push button chuck To remove deposits and ensure proper functioning of the clamping system the pushbutton chuck must be maintained with BA Ultimate Spray Interval At least once a week Require...

Страница 42: ...rbine is cleaned and disinfected 1 Press the turbine head with the chuck firmly against the spray can nozzle 2 Spray the chuck for 1 2 seconds IMPORTANT Hold the spray can upright 3 Wipe any spray tha...

Страница 43: ...y nozzle openings If your tap water is very hard lime deposits may constrict or completely block the cooling spray nozzles 1 Carefully clean the nozzle openings by running a cleaning wire through them...

Страница 44: ...te If necessary the turbine can be sterilized in packaging suitable for sterilization and storage e g paper plastic composite packaging or container Sterilize the turbine in the steam sterilizer with...

Страница 45: ...t exceed 140 C 284 F even during the drying phase After sterilizing 1 Remove the turbine from the steam sterilizer immediately CAUTION The turbine will be hot This may cause burns NOTICE Do not immers...

Страница 46: ...02 8 Maintenance Elastomers e g O rings must be replaced depending on their degree of wear 8 1 Testing the FG clamping system Interval Test the FG clamping system at least once a month Required acces...

Страница 47: ...ing appears withdrawal force 22 N Does the chuck tester slide out of the chuck before the marking ring appears CAUTION The chuck is defective and the secure fit of the bur is not guaranteed This may c...

Страница 48: ...en lamp is located in the turbine handpiece Turbine with W H connection CAUTION The halogen lamp may be hot This may cause burns Allow the halogen lamp to cool down 1 Detach the turbine from the quick...

Страница 49: ...e defective halogen lamp D out of its base 6 Insert the new halogen lamp Ensure the proper position of the contact surface 7 Wipe the bulb with a clean cloth 8 Insert the lamp holder When using a new...

Страница 50: ...tion Bien Air T2 turbine CAUTION The halogen lamp may be hot This may cause burns Allow the halogen lamp to cool down 1 Detach the turbine from the quick coupling 2 Unscrew the back B of the handpiece...

Страница 51: ...C does not become bent or damaged at the coupling fitting 5 Pull the defective halogen lamp D out of the socket 6 Insert the new halogen lamp Ensure the proper position of the contact surface 7 Wipe t...

Страница 52: ...duct does not contain any substances which are hazardous to the environment The product must be sterilized before disposal Please observe the applicable national regulations regarding disposal i 65560...

Страница 53: ...6556067_EN book Seite 53 Montag 27 November 2017 12 27 12...

Страница 54: ...F ATTENTION SN number Manufacturer with care handle number kPa Relative humidity Tempe rature Air pressure aPRSMKOMNKMVKMPKMO NNKOMNT KJk KW NOQ RSS _K K f i K r VI h _ I p o I h I k I kkO Skb r h SR...

Отзывы: