1. PRE-DRILL TWENTY 5/4 X 3 X 16" BRIDGE RAIL SLATS ON EACH END WITH A 1/8" DRILL BIT. (SEE TOP IMAGE BELOW)
2. PLACE THE BRIDGE RAIL SLATS 3" FROM THE FACE OF THE CORNER POSTS, AND ATTACH WITH 2" WOOD SCREWS.
THE SLATS WILL MOUNT ON THE OUTSIDE OF THE BRIDGE RAILS.
3. ATTACH THE REMAINING SLATS TO THE UNIT WITH 3" SPACING BETWEEN THE SLATS.
STEP 15: BRIDGE RAIL SLATS
SLAT
5/4 X 3 X 16"
BRIDGE RAIL
2" WOOD SCREW
5/4 X 3 X 16"
BRIDGE RAIL SLAT
3
4
"
"
1 16
5
5
16 "
"
4
1
1 3
1
2X
1
8 "
LEFT SIDE VIEW
3" SPACE OFF CORNER POST
3" SLAT SPACING
155
Содержание 1500KWR
Страница 6: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 52: ...WAVE SLIDE 03 0013 RAD RIDE SLIDE 03 0002 PICTURE DESCRIPTION QTY 1 1 1 SUPER SCOOP 03 0007 44...
Страница 55: ...IRON DUCTILE SWING HANGER 11 4012 DESCRIPTION PICTURE QTY 6 BRACKET 4 11 4003 GREEN 11 5013 90 SPRING CLIP 6 47...
Страница 59: ...DESCRIPTION PICTURE QTY 07 0005 2 ONE BAG 6 SAFETY HANDLE 2 HANDLES ARE IN 96 CHAIN SECTION 51...
Страница 148: ...PART II CLATTER BRIDGE 140...
Страница 177: ...APPENDIX 169...