STEP 7: LEVELING THE PLAY SET AND LAGS
1: INSTALL LAG SCREWS ONLY IN THE FOUR 2 X 6 BOARDS AT DECK HEIGHT AT THIS TIME.
SQUARE EACH OF THESE FOUR BOARDS TO THE CORNER POSTS AND THEN INSTALL THE LAG
SCREWS. THIS IS TO MAKE THE STRUCTURE RIGID FOR THE LEVELING AND SQUARING
PROCESS.
2: PLACE THE FRAME IN ITS FINAL POSITION AND FOLLOW THE PROCEDURES AT THE FRONT
OF THE MANUAL TO LEVEL AND SQUARE THE STRUCTURE. HAVE AN ASSISTANT HELP YOU
LIFT THE FRAME AS REQUIRED.
DO NOT
INSTALL REMAINING LAG SCREWS UNTIL AFTER THE
FRAME HAS BEEN LEVELED AND SQUARED.
3: ONCE THE FRAME IS LEVEL, SQUARE AND SET INTO POSITION; GO BACK AND INSERT
THE 5/16" X 3-1/2" LAG SCREWS AND 5/16" WASHERS IN ALL OF THE REMAINING HOLES OF
THE 2 X 6 PARTS ON THE FRONT, SIDES AND REAR OF THE PLAY SET. NOTE: THERE WILL NOT
BE ANY PREDRILLED HOLES IN THE CORNER POSTS FOR THE LAG SCREWS.
5/16" WASHER
LAG SCREW
***IMPORTANT***
SQUARE THESE FOUR BOARDS TO THE CORNER
POSTS , THEN INSTALL LAG SCREWS AND
WASHERS FIRST. THEN LEVEL/SQUARE THE
FRAME. FINALLY, INSTALL LAG SCREWS IN THE
REMAINING 2 X 6 BOARDS.
5/16" X 3-1/2"
FRONT OF FORT
59
Содержание 1500KWR
Страница 6: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 52: ...WAVE SLIDE 03 0013 RAD RIDE SLIDE 03 0002 PICTURE DESCRIPTION QTY 1 1 1 SUPER SCOOP 03 0007 44...
Страница 55: ...IRON DUCTILE SWING HANGER 11 4012 DESCRIPTION PICTURE QTY 6 BRACKET 4 11 4003 GREEN 11 5013 90 SPRING CLIP 6 47...
Страница 59: ...DESCRIPTION PICTURE QTY 07 0005 2 ONE BAG 6 SAFETY HANDLE 2 HANDLES ARE IN 96 CHAIN SECTION 51...
Страница 148: ...PART II CLATTER BRIDGE 140...
Страница 177: ...APPENDIX 169...