1: PLACE THE 2 X 4 X 70" UPPER LEVEL STEPS/RAILING BOARD (3 HOLES ON CENTER) AT
THE TOP OF THE REAR CORNER POSTS. THIS BOARD WILL GET ATTACHED TO THE 2ND
HOLE DOWN FROM THE TOP OF THE POSTS. THE T-NUT FOR THIS BOARD SHOULD BE ON
THE INSIDE OF EACH POST ALREADY. FASTEN THE UPPER LEVEL RAILING BOARD TO THE
REAR CORNER POSTS WITH 5/16" X 4-1/2" HEX BOLTS AND 5/16" WASHERS.
2: PLACE THE 2 X 6 X 70" SANDBOX BOARD (OFFSET UP) AT THE BOTTOM OF THE REAR
CORNER POSTS. FASTEN THE TOP HOLES IN THE SANDBOX BOARD TO THE REAR CORNER
POSTS WITH 5/16" X 4-1/2" HEX BOLTS AND 5/16" WASHERS.
3: PLACE THE 4 X 4 X 70" UPPER LEVEL UNDER DECK SUPPORT DIRECTLY UNDERNEATH THE
UPPER LEVEL DECK SUPPORTS. ATTACH THE UNDER DECK SUPPORT TO THE REAR CORNER
POSTS WITH 3/8" X 5" LAG SCREWS AND 3/8" WASHERS.
STEP 23: UPPER LEVEL - RAILING & UNDER DECK SUPPORT
WASHER
5/16"
HEX BOLT
LAG SCREW
UPPER LEVEL STEPS/RAILING BOARD
(3 HOLES ON CENTER)
3/8" X 5"
UNDER DECK SUPPORT
(OFFSET UP)
2 X 4 X 70"
4 X 4 X 70" UPPER LEVEL
SANDBOX
BOARD
5/16" WASHER
5/16" X
4-1/2"
4-1/2"
HEX BOLT
2 X 6 X 70"
5/16" X
3/8"
WASHER
75
Содержание 1500KWR
Страница 6: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 52: ...WAVE SLIDE 03 0013 RAD RIDE SLIDE 03 0002 PICTURE DESCRIPTION QTY 1 1 1 SUPER SCOOP 03 0007 44...
Страница 55: ...IRON DUCTILE SWING HANGER 11 4012 DESCRIPTION PICTURE QTY 6 BRACKET 4 11 4003 GREEN 11 5013 90 SPRING CLIP 6 47...
Страница 59: ...DESCRIPTION PICTURE QTY 07 0005 2 ONE BAG 6 SAFETY HANDLE 2 HANDLES ARE IN 96 CHAIN SECTION 51...
Страница 148: ...PART II CLATTER BRIDGE 140...
Страница 177: ...APPENDIX 169...