Pro Logger II & NaNto
oPerator's MaNuaL
Страница 1: ...Pro Logger II Nanto Operator s Manual...
Страница 2: ...liance even if it is not connected in accordance with the standard With a SafeTcheck testing Electrical Safety of Appliances is simple fast accurate thorough and safe You can test the safety of Class...
Страница 3: ...liances Option Pro Logger II only 21 RCD Tester 22 High current earth test Option Pro Logger II only 24 Battery Power Standard on Nanto Option on Pro Logger II 25 Utilities Menu F2 key 26 Info display...
Страница 4: ...ce with the standard may be found in the OTHER APPLIANCE menu If you experience difficulties or doubts in testing certain appliances please contact TRIO Test Measurement SafeTchecks are designed manuf...
Страница 5: ...nance or construction 6 months 12 months 6 months Office environment where equipment is not subject to constant flexing of the supply cord 5 years 5 years 12 months Other commercial environments e g t...
Страница 6: ...ion resistance Active Neutral to Cloak 1M Ohm Test duration Approx 3 0 seconds Electrical stress test parameters Insulation 500 250V DC Earth circuit 200mA nominal High Current Earth Test Option avail...
Страница 7: ...tal application of 240V 50Hz mains voltage Flush mounted 240V sockets with integrated LEDs to indicate active Test Socket Operating instructions On screen prompts displayed and clearly labeled switche...
Страница 8: ...er suitable for the Nanto only Carry Case Accessories for the Nanto only Stainless steel cloak 350 x 600mm Figure 8 Clover Leaf to IEC Mains adaptors Large suitcase style carry cases Scanner and or me...
Страница 9: ...on symbol and or by the absence of an earth pin on a moulded socket if not misssing or deliberately removed Note 1 Many double insulated tools are colour coded blue Note 2 If any doubt exists about th...
Страница 10: ...st socket Accessory Well Utility Socket 3 Phase Option pro logger ii only Standard 240v test plug Pro logger II only Nanto comes with adaptor cable Standard IEC Test Plug Computer I F USB Port Keyboar...
Страница 11: ...s Thumbs Up and PASS indication on LCD and a short BEEP with a GREEN indicator flashing along side Start b Fail Thumbs Down and or LCD Prompt indicating the most probable reason for failure with The m...
Страница 12: ...MANUAL 12 Operating Instructions Switch appliance ON and set thermostat or speed control to maximum Cloak Earth Return socket RETURN LEAD AND Clamp Class I II Select Earthed Appliance test Safety test...
Страница 13: ...the end of this section The stainless steel cloak may also be woven metal cloth mesh conductive braid aluminium foil or other suitable flexible conductor with low resistance Note The wrapped applianc...
Страница 14: ...Up and PASS indication on LCD and a short BEEP with a GREEN indicator flashing along side Start b Fail C Thumbs Down and or LCD Prompt indicating the most probable reason for failure with The measure...
Страница 15: ...this must be connected to the fixed test plug on the SafeTcheck with a short TEST extension lead of rated voltage and current which has been previously tested and verified SAFE Normally extension lea...
Страница 16: ...ecting one of the following Class 1 Run Test Class 2 Run Test see also Run testing 3 An earth continuity test may be conducted by selecting Earth only test see Safety Testing Earthed Appliances Select...
Страница 17: ...increased 5mA threshold because the appliance is Earthed up to 5mA of Leakage Current is permissible The person conducting the test will be warned that the 1mA threshold has been exceeded and that a 5...
Страница 18: ...speed controls remote controls etc Run testing Leakage current tests About the SafeTcheck Pro Logger II and Nanto TRIO Test Measurement recommends that the following Run tests are used only if the in...
Страница 19: ...ely 7 Press START button and follow the screen instructions The appliance will operate for up to 20 seconds during the run test 8 For Class I appliances requiring a longer than normal run test duratio...
Страница 20: ...pliance and make contact with metal parts during the test WARNING The appliance will operate for up to 20 seconds in the run test mode Ensure rotating or heating elements are able to operate safely Ap...
Страница 21: ...Pro Logger will indicate a pass Operation This test requires 2 connections to the Pro Logger an earth return connection to the Device Under Test s DUT chassis and a connection the 20 or 32A 3 phase so...
Страница 22: ...LCD only This ensures the displayed test result is visible to the user for approximately 2 minutes after the mains power is tripped as a result of testing Figure 1 Figure 2 RCD Tester Overview The Saf...
Страница 23: ...il message The SafeTcheck will provide power to the display while the RCD is reset and mains power is returned The SafeTcheck will then prompt you to perform a 180 test by resetting the RCD and then p...
Страница 24: ...al purpose setting suitable for all appliances including Electronic and IT The earth resistance threshold is set to 1 2 Routine Test 10A Same test as applied to all electrical appliances during the ma...
Страница 25: ...re initially fully charged 1 Power the SafeTcheck from mains power 2 Set the SafeTcheck into Charge mode see below 3 Wait for Charge Complete prompt to appear and then press Start to acknowledge the c...
Страница 26: ...Comment See Data Logger Operating Instructions Earth continuity 0 2A When High Current Earth Test option is fitted The Earth Continuity Current maybe set to either 0 2A as a default or as a one off Ro...
Страница 27: ...to reduce the chance of an erroneous test result During a Probe Test the feature is disabled This gives the operator the ability to use the probe the cloak or a combination of both to test Double Ins...
Страница 28: ...it difficult to use the cloak or To switch between the Double Insulated Probe Test and Options go to the Utilities Menu under the F2 Key Scroll down to the Option using the F2 Key and then select the...
Страница 29: ...then the number of records used will be displayed prior to the Start Prompt This information may be displayed at any time by pressing the F1 key while the LCD displays the Start Prompt Additional data...
Страница 30: ...e prompt for Tag Number appears at the conclusion of a successful test except in the case of RCD tests For RCD tests the Tag Number is entered prior to the test If the Electrical Test is unsuccessful...
Страница 31: ...ss Fail On or Off If set to On the field may not be empty Ask for Tag Turns prompt for the Test Tag Number On or Off If set to On the field may not be empty Ask for Comment Turns prompt for the Commen...
Страница 32: ...Fail or Abort dependent on the result for each test IR Insulation Resistance Measured Value M LC Leakage Current Measured Value mA ER Earth Resistance Measured Value EC Electrical Continuity Not impl...
Страница 33: ...plications including Microsoft Excel Stored test records should be uploaded to a PC at the end of each testing session or at regular intervals Note The USB cable is supplied together with the Scanner...
Страница 34: ...following barcodes from Start to End Setup 1 Places a Enter at the end of each scanned barcode Default Setup 2 Removes the Enter at the end of each scanned barcode Note While the SafeTcheck has been t...
Страница 35: ...with Always use a Probe when conducting a live Run Test To switch between the Double Insulated Probe Test and Options go to the Utilities Menu under the F2 Key scroll to the Option using the F1 F2 Key...
Страница 36: ...lbourne Sydney Telephone 1300 852 402 Facsimile 1300 853 409 Email sales triotest com au safety triotest com au Visit www triotest com au www SafeTcheck com au SafeTcheck PATs are designed and manufac...