Note:
You can verify the con
fi
guration backup
fi
le was created successfully by removing the
fl
ash drive from the
G-Force and checking on a computer to ensure that the newly created
fi
le, “
backup_mm_dd_yy
”, is there.
Figure 3: System Confi guration Page - Create Backup
5.2.2
Software Upgrade
•
Copy the content of the folder initial_install_
V2.X.X
to a USB Flash Drive.
The USB must contain only this as content: Default_X20CP04xx, Default_X20CP04xx_RemoteIn-
stall folder and arnbcfg.xml
fi
le. (Refer below)
•
Power down the G-Force and ensure the Flash Drive with the Software upgrade
fi
le is in the USB
service port (Ref: Fig 1).
•
Power up the G-Force®. The CPU will be automatically updated. During this process, the CPU will
reboot at least once (LEDs will
fl
ash o
ff
). There is no other visual feedback that the USB update is
in progress. When the handle reads G-Force Ready to Lift, it indicates the update is complete.
5.2.3
Updating the confi guration from the backup
•
Inside the VNC Viewer click the System Con
fi
g tab on the left pane of the Visualization to open the
con
fi
guration page.
• Click
on
USB
(Ref: Fig 4 – Green Circle) to see the available con
fi
guration
fi
les.
• Use
the
Up
and
Down Arrow Keys
(Ref: Fig 4 – Green Box) to choose the
fi
le created in step 5.1
named similar to “
backup_mm_dd_yy
” (Ref: Fig 4 – Red Box).
• Click
on
Import From Selected
(Ref: Fig 4 – Red Circle), to apply all the con
fi
guration settings
that were previously set before the software upgrade.
•
Restart the G-Force® to apply the settings.
G-Force® & Easy Arm Q2 - iQ2 Service Manual
Gorbel Inc.
Revised 5/21
5 - 3
Содержание G-Force iQ2 Series
Страница 2: ...G Force Easy Arm Q2 iQ2 Service Manual Gorbel Inc Revised 5 21 0 1 This page intentionally left blank...
Страница 4: ...G Force Easy Arm Q2 iQ2 Service Manual Gorbel Inc Revised 5 21 0 3 This page intentionally left blank...
Страница 19: ...This page is intentionally left blank G Force Easy Arm Q2 iQ2 Service Manual Gorbel Inc Revised 5 21 5 5...
Страница 42: ...This page is intentionally left blank G Force Easy Arm Q2 iQ2 Service Manual Gorbel Inc Revised 5 21 7 3...
Страница 43: ...ACTUATOR PCB GEN 2 G Force Easy Arm Q2 iQ2 Service Manual Gorbel Inc Revised 5 21 7 4...
Страница 45: ...This page is intentionally left blank G Force Easy Arm Q2 iQ2 Service Manual Gorbel Inc Revised 5 21 7 6...
Страница 83: ...G Force Easy Arm Q2 iQ2 Service Manual Gorbel Inc Revised 5 21 9 30 This page is intentionally left blank...
Страница 105: ...G Force Easy Arm Q2 iQ2 Service Manual Gorbel Inc Revised 5 21 9 52 This page is intentionally left blank...
Страница 111: ...G Force Easy Arm Q2 iQ2 Service Manual Gorbel Inc Revised 5 21 9 58 Remote Force Sensing Hub SEE CHART 1...
Страница 112: ...G Force Easy Arm Q2 iQ2 Service Manual Gorbel Inc Revised 5 21 9 59 FSH HUB Options...
Страница 113: ...G Force Easy Arm Q2 iQ2 Service Manual Gorbel Inc Revised 5 21 9 60 This page is intentionally left blank...
Страница 119: ...G Force Easy Arm Q2 iQ2 Service Manual Gorbel Inc Revised 5 21 9 66 Diagram G 1a G360 with Air Assembly and Disassembly...
Страница 120: ...G Force Easy Arm Q2 iQ2 Service Manual Gorbel Inc Revised 5 21 9 67 Diagram G 1b G360 Assembly and Disassembly...
Страница 121: ...G Force Easy Arm Q2 iQ2 Service Manual Gorbel Inc Revised 5 21 9 68 This page is intentionally left blank...
Страница 136: ...G Force Easy Arm Q2 iQ2 Service Manual Gorbel Inc Revised 5 21 9 83 This page is intentionally left blank...