G-Force® & Easy Arm Q2 - iQ2 Service Manual
Gorbel Inc.
Revised 5/21
9 - 69
Procedure G-2A. Swivel Sub-Assembly Disassembly Procedure
1. Remove the swivel sub-assembly from the G360™ assembly. Refer to Procedure G-1A.
2. Remove the C-ring from the swivel sub-assembly.
3. Remove the Delrin spacer washer from the swivel sub-assembly.
4. Remove the secondary slip ring PCB from the swivel casting. Be very careful to not deform the contacts on the
PCB.
5. Remove the primary slip ring PCB from the swivel by removing the input connector nut,
6. (3) M2 Phillips head machine screws (PHMS), (4) nylon Phillips head machine screws (PHMS), and (12)
fl
at-
washers from the swivel casting.
7. Remove the bearing from the swivel casting if necessary.
Note: This bearing is pressed into the swivel casting.
Procedure G-2B. Swivel Sub-Assembly Reassembly Procedure
1. Press the bearing into the swivel casting if it was replaced.
2. Install the primary slip ring PCB into the swivel casting by installing the input connector nut, (3) M2 Phillips head
machine screws (PHMS), (4) nylon Phillips head machine screws (PHMS), and (12)
fl
atwashers.
3. Install the secondary slip ring PCB into the swivel casting. Be very careful to not deform the contacts on the
PCB.
4. Install the Delrin spacer washer onto the swivel sub-assembly.
5. Install the C-ring onto the swivel sub-assembly. Check to see that the assembly moves freely.
6. Install the swivel sub-assembly into the G360™ assembly. Refer to Procedure G-1B.
Diagram G-2
.
Swivel Sub-Asssembly Disassembly and Reassembly.
Note: Numbers in
Parentheses are
Gorbel® Part Numbers
Slide Handle Swivel
(74206)
Ball Bearing, 6005-NSE
(74221)
PCB, Slip Ring, Primary
(74235)
3x PHMS, M2 x 0.4 - 6,
SEMS, Split Lock (65073)
4x Nylon PHMS and Flatwashers
Washer, Spacer, Delrin
(74218)
Input Connector Nut
PCB, Slip Ring, Secondary
(74236)
C-Ring 31.75mm
(65074)
Содержание G-Force iQ2 Series
Страница 2: ...G Force Easy Arm Q2 iQ2 Service Manual Gorbel Inc Revised 5 21 0 1 This page intentionally left blank...
Страница 4: ...G Force Easy Arm Q2 iQ2 Service Manual Gorbel Inc Revised 5 21 0 3 This page intentionally left blank...
Страница 19: ...This page is intentionally left blank G Force Easy Arm Q2 iQ2 Service Manual Gorbel Inc Revised 5 21 5 5...
Страница 42: ...This page is intentionally left blank G Force Easy Arm Q2 iQ2 Service Manual Gorbel Inc Revised 5 21 7 3...
Страница 43: ...ACTUATOR PCB GEN 2 G Force Easy Arm Q2 iQ2 Service Manual Gorbel Inc Revised 5 21 7 4...
Страница 45: ...This page is intentionally left blank G Force Easy Arm Q2 iQ2 Service Manual Gorbel Inc Revised 5 21 7 6...
Страница 83: ...G Force Easy Arm Q2 iQ2 Service Manual Gorbel Inc Revised 5 21 9 30 This page is intentionally left blank...
Страница 105: ...G Force Easy Arm Q2 iQ2 Service Manual Gorbel Inc Revised 5 21 9 52 This page is intentionally left blank...
Страница 111: ...G Force Easy Arm Q2 iQ2 Service Manual Gorbel Inc Revised 5 21 9 58 Remote Force Sensing Hub SEE CHART 1...
Страница 112: ...G Force Easy Arm Q2 iQ2 Service Manual Gorbel Inc Revised 5 21 9 59 FSH HUB Options...
Страница 113: ...G Force Easy Arm Q2 iQ2 Service Manual Gorbel Inc Revised 5 21 9 60 This page is intentionally left blank...
Страница 119: ...G Force Easy Arm Q2 iQ2 Service Manual Gorbel Inc Revised 5 21 9 66 Diagram G 1a G360 with Air Assembly and Disassembly...
Страница 120: ...G Force Easy Arm Q2 iQ2 Service Manual Gorbel Inc Revised 5 21 9 67 Diagram G 1b G360 Assembly and Disassembly...
Страница 121: ...G Force Easy Arm Q2 iQ2 Service Manual Gorbel Inc Revised 5 21 9 68 This page is intentionally left blank...
Страница 136: ...G Force Easy Arm Q2 iQ2 Service Manual Gorbel Inc Revised 5 21 9 83 This page is intentionally left blank...