7. Select the desired “heating” speed tap by positioning

switches 7 and 8 appropriately.  Refer to figure above.  Turn
off power to furnace for a minimum of 10 seconds, allowing
motor to reset and recognize new speed selection.  Turn on
power to furnace.  Verify selected CFM by counting the green
CFM LED blinks.

In general lower heating speeds will: reduce electrical consump-
tion, lower operating sound levels of the blower, and increase the
outlet air temperature delivered to the home.   The speeds available
allow the blower performance to be optimized for the particular
homeowner’s needs.

B

LOWER

 H

EAT

 O

FF

 D

ELAY

 T

IMINGS

The integrated control module provides a selectable heat off delay
function. The heat off delay period may be set to 90, 120, 150, 180
seconds using the DIP switches or jumper provided on the control
module. The delay is factory shipped at 150 seconds but may be
changed to suit the installation requirements and/or homeowner pref-
erence. Refer to the following figures for switch positions and corre-
sponding delay times.

Heat Off

Delay

 90 Seconds

ON
ON

1

2

3

Heat Off

Delay

120 Seconds

Heat Off

Delay

150 Seconds

Heat Off

Delay

180 Seconds

ON

OFF

1

2

3

ON

1

2

3

1

2

3

OFF
OFF

Heat Off Delay

(* indicates factory setting)

*

OFF

Heat Off Delay Switches

XV. NORMAL SEQUENCE OF OPERATION

P

OWER

 U

P

The normal power up sequence is as follows:

115 VAC power applied to furnace.

Integrated control module performs internal checks.

Integrated control module flashes LED one time.

Integrated control module monitors safety circuits
continuously.

Furnace awaits call from thermostat.

H

EATING

 M

ODE

The normal operational sequence in heating mode is as follows:

R and W1 (or R and W1/W2) thermostat contacts close,
initiating a call for heat.

Integrated control module performs safety circuit checks.

Induced draft blower is energized on high speed for a 15-
second prepurge.  Humidifier terminals are energized with
induced draft blower.

Induced draft blower steps to low speed following prepurge.
Low stage pressure switch contacts are closed.

Igniter warm up begins upon step to low speed and presence
of closed low stage pressure switch contacts.

Gas valve opens at end of igniter warm up period, delivering
gas to burners and establishing flame.

Integrated control module monitors flame presence.  Gas
valve will remain open only if flame is detected.

If the thermostat call is for low heat, gas valve and induced
draft blower will continue on low stage. If the call is for high
heat, the gas valve and induced draft blower will change to
high stage.

Circulator blower is energized on heat speed following a fixed
thirty second blower on delay.  The circulator blower requires
thirty (30) seconds to ramp up to full speed. Electronic air
cleaner terminals are energized with circulator blower.

Furnace is now operating on the specified stage called for
by the two-stage thermostat.

Furnace runs, integrated control module monitors safety
circuits continuously.

If the two-stage thermostat changes the call from low heat to
high heat, the integrated control module will immediately
switch the induced draft blower, gas valve, and circulator
blower to their high stage settings.

If the two-stage thermostat changes the call from high heat
to low heat, the control will immediately switch the induced
draft blower and gas valve to their low stage settings.  The
circulator blower will remain on high heating speed for thirty
(30) seconds before switching to the low heat circulating

speed.

R and W1 (or R and W1/W2) thermostat contacts open,
completing the call for heat.

Gas valve closes, extinguishing flame.

Induced draft blower is de-energized following a fifteen
second post purge. Humidifier terminals are de-energized.

Circulator blower continues running for the selected heat off
delay period (90, 120, 150 or 180 seconds).  The speed run
during this period depends on the last heat call provided by
the thermostat.
If the last call for heat was a call for low heat, the air circulator
motor will run on low heat speed for the duration of the heat
off delay period (90, 120, 150 or 180 seconds).
If the last call for heat was a call for high heat, the air circulating
motor will run on the high heating speed for thirty (30) seconds
and then switch to the low heating speed for the 

balance 

of

the heat off delay period (60, 90, 120 or 150 seconds).

Circulator blower and electronic air cleaner terminals are de-
energized.

Circulator blower ramps down to OFF during the 30 seconds

following the heat off delay period.

Furnace awaits next call from thermostat.

C

OOLING

 M

ODE

The normal operational sequence in cooling mode is as follows:

R and YLO/G or Y/G thermostat contacts close, initiating a
call for cool.

Integrated control module performs safety circuit checks.

Содержание GCV9 Series

Страница 1: ...han when the unit is in operation Remember it is your responsibility to install the product safely and to know it well enough to be able to instruct a customer in its safe use Safety is a matter of co...

Страница 2: ...ES 12 TERMINATION LOCATIONS 13 CANADIAN VENTING REQUIREMENTS 13 STANDARD FURNACE CONNECTIONS 13 ALTERNATE FURNACE CONNECTIONS 14 NON DIRECT VENT SINGLE PIPE PIPING 16 DIRECT VENT DUAL PIPE PIPING 17 V...

Страница 3: ...cuit Description 33 GENERAL 33 INTEGRATED CONTROL MODULE 33 PRIMARY LIMIT 33 AUXILIARY LIMIT 33 ROLLOUT LIMIT 33 PRESSURE SWITCHES 33 FLAME SENSOR 33 XVIII Troubleshooting 33 ELECTROSTATIC DISCHARGE E...

Страница 4: ...warranty certificate is also supplied with the unit Read the warranty carefully and note what is covered Keep the warranty certificate in a safe location for future reference If additional informatio...

Страница 5: ...itch 24 Inductor Not All Models 25 Two Stage Integrated Control Module with fuse and diagnostic LED 26 24 Volt Thermostat Connections 27 Transformer 40 VA 28 ECM Variable Speed Circulator Blower 29 Au...

Страница 6: ...ion are replaced The input rate and temperature rise are set per the furnace rating plate The input rate and temperature rise are set per the furnace rating plate 100 outside air is provided for combu...

Страница 7: ...ems Do not install the furnace where the combustion air is exposed to the following substances chlorinated waxes or cleaners chlorine based swimming pool chemicals water softening chemicals deicing sa...

Страница 8: ...rrected Corrections must be in accordance with the latest edition of the Na tional Fuel Gas Code NFPA 54 ANSI Z223 1 and or CSA B149 In stallation Codes printing inks paint removers varnishes hydrochl...

Страница 9: ...red a part of the unconfined space 5 3 3 Equipment Located in Confined Spaces a All Air from Inside the Building The confined space shall be pro vided with two permanent openings communicating directl...

Страница 10: ...ree area in 5 3 3 consideration shall be given to the block ing effect of louvers grilles or screens protecting openings Screens used shall not be smaller than 1 4 inch mesh If the area through a desi...

Страница 11: ...ed for the drain trap Additionally the appropriate downward piping slope must be maintained from the drain trap to the drain location Refer to Section X Condensate Drain Trap and Lines for further det...

Страница 12: ...is the responsibility of the installer to follow the manufacturers recommendations and to verify that all vent flue piping and connec tors are compatible with furnace flue products Additionally it is...

Страница 13: ...es should be made for minor expansion and contraction due to temperature variations For this reason particular care must be taken to secure piping when a long run is followed by a short offset of less...

Страница 14: ...t flue and combustion air intake piping run vertically from the side of the cabinet NOTE Standard and alternate locations can be combined i e an installation may use the standard combustion air intake...

Страница 15: ...tion refer to the following steps and the Alternate Combus tion Air Intake Location figure NOTE Counterflow unit instructions follow the upflow instructions 1 Remove and save the four screws securing...

Страница 16: ...be in stalled on the inside and outside of the wall The wall penetration should be sealed with silicone caulking material In a basement installation the vent flue pipe can be run between joist spaces...

Страница 17: ...er for construction of the vent flue and combustion air intake pipe systems of a direct vent dual pipe installation The number of elbows tabulated represents the number of elbows and or tees in each V...

Страница 18: ...LEVEL Standard Horizontal Terminations Dual Pipe 24 MAX 3 MIN 24 MAX AIR INTAKE 90 MEDIUM RADIUS ELBOW 12 MIN ABOVE HIGHEST ANTICIPATED SNOW LEVEL Alternate Horizontal Vent Termination Dual Pipe SUPPO...

Страница 19: ...d through the right or left side panel and into the drain trap secured to the outside of the cabinet NOTE Refer to Section X Condensate Drain Lines and Drain Trap Alternate Vent Flue Hose Connections...

Страница 20: ...p 2 Secure drain trap to side panel at the mounting holes dimples or crosshairs on counterflow models located below the grommet drain holes 3 Attach PVC drain line to drain trap outlet with either a 9...

Страница 21: ...NG ANY ELECTRICAL WIRING CAUTION LABEL ALL WIRES PRIOR TO DISCONNECTION WHEN SERVICING CONTROLS WIRING ERRORS CAN CAUSE IMPROPER AND DANGEROUS OPERATION VERIFY PROPER OPERATION AFTER SERVICING WIRING...

Страница 22: ...e Condensing Unit Single Stage Cooling Dehumidistat Optional NOTE To apply a single stage heating thermostat the thermostat selector jumper on the integrated Control module must be set on single stage...

Страница 23: ...eaner 1 0 Amp maximum at 120 VAC Turn OFF power to the furnace before installing any accessories Follow the humidifier or air cleaner manufacturers instructions for locating mounting grounding and con...

Страница 24: ...ring the gas supply pressure and manifold pressure are provided on the valve The gas valve has a manual ON OFF control located on the valve itself This control may be set only to the ON or OFF positio...

Страница 25: ...opane gas leak Rust can reduce the level of odorant in propane gas Do not rely on your sense of smell Contact a local propane connection is 375 in lbs excessive over tightening may damage the gas valv...

Страница 26: ...ng a pair of seamer pliers or seamer tongs NOTE Airflow area will be reduced by ap proximately 18 if duct flanges are not unfolded This could cause performance issues and noise issues WARNING EDGES OF...

Страница 27: ...ds If the furnace is installed without filters the warranty will be voided On upflow units guide dimples locate the side return cutout locations Use a straight edge to scribe lines connecting the dimp...

Страница 28: ...h an ignition device which automatically lights the burner Do not try to light the burner by hand 5 Move the furnace gas valve manual control to the OFF position 6 Wait five minutes then smell for gas...

Страница 29: ...w 8 Remove regulator cover screw from the low LO outlet pressure regulator adjust tower and turn screw clockwise to increase pressure or counterclockwise to decrease pressure 9 Energize main M solenoi...

Страница 30: ...t High Stage Heat Tap Model 390 520 715 930 600 800 1100 1430 840 920 1000 1080 1210 1325 1440 1555 A B C D 520 715 910 1170 800 1100 1400 1800 1125 1195 1265 1335 1620 1720 1820 1920 A B C D 520 715...

Страница 31: ...to enhance cooling performance and increase comfort level The ramping profiles are selected using DIP switches 5 and 6 Refer to the following figure for switch positions and their corresponding taps...

Страница 32: ...e monitors flame presence Gas valve will remain open only if flame is detected If the thermostat call is for low heat gas valve and induced draft blower will continue on low stage If the call is for h...

Страница 33: ...etected will take the necessary precau tions and provide diagnostic information through an LED PRIMARY LIMIT The primary limit control is located on the partition panel and moni tors heat exchanger co...

Страница 34: ...r leakage Check the outside termination and the connections at and internal to the furnace Heat exchanger Check for corrosion and or buildup within the heat exchanger passageways Burners Check for pro...

Страница 35: ...9 Clean residue from furnace using a vacuum cleaner 10 Replace the parts removed in the previous steps in reverse order 11 Turn on electrical power and gas to furnace Check for leaks and proper unit...

Страница 36: ...36...

Страница 37: ...Inspect pressure switch hose Repair if necessary Inspect flue and or inlet air piping for blockage proper length elbows and termination Check drain system Correct as necessary Correct pressure switch...

Страница 38: ...emove obstruction Check circulator blower speed and performance Correct speed or replace blower if necessary Check burners for proper alignment Check flue and air inlet piping for blockage proper leng...

Страница 39: ...OLS SINGLE CONTROL ON 45 kBTU PK PINK PLUG CONNECTION BURNER COMPARTMENT BLOWER COMPARTMENT VT IGNITER 2 MANUFACTURER S SPECIFIED REPLACEMENT PARTS MUST BE USED WHEN SERVICING PK YL 5 FLASHES FLAME SE...

Страница 40: ...40 2004 2006 Goodman Manufacturing Company L P 2550 North Loop West Suite 400 Houston TX 77092 www goodmanmfg com...

Отзывы: