Page
•
globalcontract.com
14
• Summer 2017
GLOBAL
Contract
INSTALLATION GUIDELINES
Due to narrow cavity of the raceway, there can only be one Duplex Receptacle Block
installed at given location, protruding through either the inside face or the outside face
of the panel (the Duplex Receptacle Blocks cannot be installed back-to-back). For this
reason, the direction of Duplex Receptacle Blocks within one panel run would typically
alter (one inside, one outside, as illustrated Fig. A). (Panels 36” and wider)
Duplex Receptacle Blocks can be also installed facing in the same direction (Fig. B).
There are four partial knock out holes in each raceway cover.
Confi rm which side of the panel the Duplex Receptacle Blocks are going to face and
create opening in raceway covers by removing the desired partial knock-outs.
STEP 1: Determine type and location of an Electrical Feed (ceiling or fl oor).
Both Electrical Feeds enter the raceway cavity through Receptacle opening the
raceway cover.
The Base Electrical Feed connects to a fl oor monuments within 6’.
The Ceiling Feed rises up within a dedicated Power Pole. This Power Pole is secured
to the outside of the panel and utilizes a “scoop” in the rear edge of the work surface
to reach the ceiling. The “scoop” must be located immediately above the Receptacle
opening in the Raceway Cover through which the Ceiling Feed is to enter the Raceway
cavity.
STEP 2: Begin the actual installation by threading the Electrical Feed’s fl exible conduit
through the Receptacle opening in the Raceway Cover. Thread from the inside out.
STEP 3: Follow the installation specifi cations and interconnect all components
(Electrical Feed Block, Duplex Receptacle Blocks, Harnesses) on the fl oor, next to the
panel run.
STEP 4: Snap Receptacle Spacer to the bottom groove of Diet panel frame. Use one
Receptacle Spacer on each end of the panel. Ensure that the Receptacle Spacer rests
snugly next to panel’s vertical extrusion.
Diet Electrical installation
Figure A
Figure B
2
3
4