
Page
•
globalcontract.com
26
• Summer 2017
GLOBAL
Contract
INSTALLATION GUIDELINES
STEP 1: Remove three top screws to separate horizontal arm.
STEP 2: Engage bottom cantilever bracket into panels’ bottom horizontal rail.
STEP 3: Bring cantilever’s upright into vertical position.
STEP 4: Engage horizontal cantilever arm into panel’s mid horizontal rail.
STEP 5: Align holes and replace three top screws.
Slide cantilever into desired position and proceed with installation or worksur-
faces.
Off-Module Cantilever
1
2
5
3
4