Page
•
globalcontract.com
12
• Summer 2017
GLOBAL
Contract
Diet Electrical
STEP 1: Make sure that all panel structures and work surfaces are leveled and
securely connected before proceeding with installation of power components.
STEP 2: Identify type and length of specifi ed components and position them in ac-
cordance with layout plans.
Interconnect electrical components while proceeding from Electrical Feed Harness. To
prevent the danger of electric shock, connect the Electrical Feed Harness to the build-
ing power supply only after completing the installation.
Test all Receptacles and ensure that circuits no. 1 and 2 correspond to specifi ed
electrical layout.
STEP 3: Install data and communication cable bundles and terminals.
STEP 4: Walk through; conduct a thorough installation inspection with the client.
WARNING : It is recommended that installation of electrical harness be made under
the supervision of a licensed electrician in accordance with applicable
codes and regulations. Always determine that harness is electrically
connected to only one power supply.
INSTALLATION GUIDELINES
NEUTRAL
GROUND
HOT 2
HOT 1
WHITE
GREEN/BARE
RED
BLACK