Page
•
globalcontract.com
8
• Summer 2017
GLOBAL
Contract
INSTALLATION GUIDELINES
Diet to Boulevard Connecting Kit
Diet - to - Boulevard connecting kit typically consists of two extruded aluminum
profi les. Boulevard strips, screws to secure connecting extruded profi le to Diet panel
and a cap.
There are three basic confi gurations (please note the position and the use of ‘Connec-
tor and Filler profi les):
STEP 1: Begin the actual installation by securing Connector profi le to Diet panel’s ver-
tical with supplied screws. Note the asymmetrical shape of connector extrusion and
ensure that the larger side of the connector detail must be on the left side when facing
panel’s vertical extrusion or it would not engage with Boulevard panel interface.
STEP 2: Place Diet-Connector subassembly next to Boulevard panel. Ensure that
bottom of the Diet-BLVD Connector rests on top of self leveling feature at the bottom
of BLVD panels.
STEP 3: Install Boulevard capture strips.
STEP 4: Install Boulevard capture strips.
STEP 5: Install the next Boulevard panel or Aluminum vertical end trim.
STEP 6: Finish by installing top cap (injection molded cap for Boulevard 1 and 2;
aluminum cap for Boulevard System 3)
“T” (even height)
“X” (even height
“T” (uneven height)
“X” uneven height requires one
more fi ller profi le
1
3
6
4
2
5