Off-Module Panel Connector
INSTALLATION GUIDELINES
To connect two panels in an off-module, “T” confi guration remove panel vertical edge
trim and remove all connectors and spacers.
STEP 1: Secure top off-module bracket to panel vertical with supplied screws.
STEP 2: Drive levelers on the second panel all the way in and hold the panel in a tilted
position. Slide it carefully over the top bracket as illustrated, while making sure that the
bracket is seated inside of the top horizontal rail.
STEP 3: Bring the panel carefully into a vertical position and adjust its fi nal location.
STEP 4: Engage bottom off-module bracket in bottom horizontal panel rail.
STEP 5: Secure with supplied screws to panel vertical and level the whole assembly.
STEP 6: Install two set screws in the top bracket to prevent the top bracket from sliding
sideways and tighten carefully with supplied allan key. If the off-modularly connected
panel is higher then the perpendicular one, cut a vertical edge trim (removed earlier
from panel) and snap it onto the panel’s vertical, between top corner cap and top of the
upper, off-module bracket. If the perpendicular panel does not have base cable manager
installed, the bottom of the off-module panel will be exposed. In such instances cut 4
5/8” long pieces from the vertical edge trim and snap it onto the panel’s vertical at
the bottom.