
Page
•
globalcontract.com
24
• Summer 2017
GLOBAL
Contract
STEP 1: Remove panel’s top corner cap by carefully tapping the underside of the
cap through side vertical groves. Pre-assemble both brackets, screws and screw
anchors by threading the screws through the brackets holes and turning screw
anchors. Alternatively, the top corner caps do not have to be removed if the trans-
action bracket is installed from bottom of panel, prior to installing worksurfaces,
pedestals or gable legs.
STEP 2: Slide the brackets with screw anchors into panel’s vertical groves as
illustrated.
Replace corner cap and:
STEP 3: place a level on top of the corner cap.
STEP 4: Align top of the bracket with the bottom of the level.
STEP 5: Tighten both screws and repeat to secure the bracket on the opposite
side of the panel.
STEP 6: Place transaction top on the brackets.
STEP 7: Secure the top with supplied wood screws.
Transaction Brackets
INSTALLATION GUIDELINES
2
3
4
6
7
1
5