50
Cooking Instructions
7 - 1 Marinating Process
Marinating is the process by which salt and special spices are absorbed into the tissue to enhance the fla-
vor of the chicken. This procedure is one of the primary factors that accounts for Chester Fried’s remark-
able taste appeal. Therefore, the marinating process must be implemented and with maximum efficiency.
The Marinating Procedure:
* Draws blood from the chicken.
* Tenderizes the meat.
* Raises the moisture content and the weight of the bird 10 to 12%.
* Allows the flavoring to be absorbed into the tissue of the meat in order to enhance the flavor of
the chicken.
* Helps reduce bacteria build up.
Recommended Marinating Procedure
1.
Take
3
⁄
4
cup (177ml) of Chester Fried Marinade and mix thoroughly with 3 gallons (11.4L) of COLD
water.
2.
Always press the bone through the thigh and fold the wings before marinating them.
3.
Place the chicken pieces in the solution and let them soak for 12 to 18 hours at 38°F (3.3°C).
4.
Remove the chicken from the marinade water.
5.
Rinse chicken with cold tap water and place in proper storage container with colander.
6.
Place a thin layer of ice on top of the chicken and store at 38°F (3.3°C).
CAUTION
DO NOT allow the chicken to marinate over 18 hours.
7 - 2 Batter Dip Seasoning
The batter dip procedure is a very important bridge between marinating and breading. The batter season-
ing accentuates the flavor of the meat and breading and ensures the breading will stay on the chicken dur-
ing the frying process.
* Mix 3 cups (708ml) of Chester Fried Batter Dip with 3 gallons (11.4L) of COLD water.
NOTE:
When using the Chester Fried Bread and Batter Table, use 3 gallons (11.4L) of Batter Dip in the Dipper Well.
CAUTION
Change the batter after dipping 140 lb. (63.5kg) of the poultry.
!
!
Содержание Chester Fried CF 400
Страница 10: ...7 Operating Instructions ...
Страница 16: ...13 Fryer Components and Their Function Cooking Vessel Figure 3 3 6 2 1 5 4 ...
Страница 29: ...26 Preparing the Fryer for Operation Filter Pan Shown with Drain Hose Attached Figure 7 ...
Страница 39: ...36 Preparing the Fryer for Operation Figure 11 VH Series ...
Страница 43: ...40 Upper Rear Panel Removed Showing Location of Fire Suppression System Figure 12 Fire Suppression System ...
Страница 46: ...43 Fire Suppression System 6 6 Illustrations Fire Suppression Plumbing Diagram ...
Страница 48: ...45 Fire Suppression System 6 6 Illustrations Fusible Link Conduit Diagram ...
Страница 50: ...47 Fire Suppression System 6 6 Illustrations Manual Pull Conduit Diagram ...
Страница 52: ...49 Fire Suppression System 6 6 Illustrations Fire Suppression Conduit Diagram ...
Страница 68: ...65 Wiring Model CF 400 500 1 phase 10 2 Wiring Diagram NOTE UNLESS OTHERWISE NOTED ALL WIRES ARE 18 GAUGE ...
Страница 70: ...67 Wiring Model CF 400 500 3 phase 10 4 Wiring Diagram NOTE UNLESS OTHERWISE NOTED ALL WIRES ARE 18 GAUGE ...
Страница 72: ...69 Wiring Model CF 400 VH 1 phase 10 6 Wiring Diagram NOTE UNLESS OTHERWISE NOTED ALL WIRES ARE 18 GAUGE ...
Страница 74: ...71 Wiring Model CF 400 VH 3 phase 10 8 Wiring Diagram NOTE UNLESS OTHERWISE NOTED ALL WIRES ARE 18 GAUGE ...
Страница 76: ...73 Wiring Model CF 500 VH 1 phase 10 10 Wiring Diagram NOTE UNLESS OTHERWISE NOTED ALL WIRES ARE 18 GAUGE ...
Страница 78: ...75 Wiring Model CF 500 VH 3 phase 10 12 Wiring Diagram NOTE UNLESS OTHERWISE NOTED ALL WIRES ARE 18 GAUGE ...
Страница 79: ...76 Wiring Model CF 400 500 1 3 Phase 10 13 Wiring Schematic ...