
21
Testing the Fryer
3.
The wet element should dry within 15 seconds after fryer element shut-off signifying heat.
4.
If the elements do not appear operational, refer to the troubleshooting guide.
5.
If the heating elements are operational, clean the fryer as described under instructions for the boil-out
procedure described in this manual.
6.
After thorough cleaning, fill fry pot to proper level with shortening.
4 - 3 Operational Check-Out of the Filter Pump
1.
Open the fryer’s front door.
2.
Disconnect the filter-pan hose by lifting the insulating ring on the quick-disconnect and pull the hose out
of this fitting
CAUTION
The following step requires starting of the fryer’s filter pump in a “DRY” condition. The
pump should only be operated for a few seconds in this manner or damage to the unit will
occur.
3.
Place the fryer’s Power Switch to the “ON” position.
4.
Place your palm over the quick-disconnect at the point where the nose from the filter-pan connects.
5.
Briefly place the Selector Switch in the “FILTER” position. If suction is felt on the hand covering the
quick-disconnect, the pump is operational. If the above steps are followed and no suction is felt, consult
the troubleshooting guide.
!
Содержание Chester Fried CF 400
Страница 10: ...7 Operating Instructions ...
Страница 16: ...13 Fryer Components and Their Function Cooking Vessel Figure 3 3 6 2 1 5 4 ...
Страница 29: ...26 Preparing the Fryer for Operation Filter Pan Shown with Drain Hose Attached Figure 7 ...
Страница 39: ...36 Preparing the Fryer for Operation Figure 11 VH Series ...
Страница 43: ...40 Upper Rear Panel Removed Showing Location of Fire Suppression System Figure 12 Fire Suppression System ...
Страница 46: ...43 Fire Suppression System 6 6 Illustrations Fire Suppression Plumbing Diagram ...
Страница 48: ...45 Fire Suppression System 6 6 Illustrations Fusible Link Conduit Diagram ...
Страница 50: ...47 Fire Suppression System 6 6 Illustrations Manual Pull Conduit Diagram ...
Страница 52: ...49 Fire Suppression System 6 6 Illustrations Fire Suppression Conduit Diagram ...
Страница 68: ...65 Wiring Model CF 400 500 1 phase 10 2 Wiring Diagram NOTE UNLESS OTHERWISE NOTED ALL WIRES ARE 18 GAUGE ...
Страница 70: ...67 Wiring Model CF 400 500 3 phase 10 4 Wiring Diagram NOTE UNLESS OTHERWISE NOTED ALL WIRES ARE 18 GAUGE ...
Страница 72: ...69 Wiring Model CF 400 VH 1 phase 10 6 Wiring Diagram NOTE UNLESS OTHERWISE NOTED ALL WIRES ARE 18 GAUGE ...
Страница 74: ...71 Wiring Model CF 400 VH 3 phase 10 8 Wiring Diagram NOTE UNLESS OTHERWISE NOTED ALL WIRES ARE 18 GAUGE ...
Страница 76: ...73 Wiring Model CF 500 VH 1 phase 10 10 Wiring Diagram NOTE UNLESS OTHERWISE NOTED ALL WIRES ARE 18 GAUGE ...
Страница 78: ...75 Wiring Model CF 500 VH 3 phase 10 12 Wiring Diagram NOTE UNLESS OTHERWISE NOTED ALL WIRES ARE 18 GAUGE ...
Страница 79: ...76 Wiring Model CF 400 500 1 3 Phase 10 13 Wiring Schematic ...