20
Testing the Fryer
We at Chester Fried take pride in the quality of our workmanship. Every effort has been made to ensure
your unit is in good operating condition when you receive it. Each unit must pass a rigorous quality control
test prior to shipment. To further ensure optimum operation of your new unit, we recommend a brief
operational check-out of your new fryer.
CAUTION
Before attempting to operate the unit, refer to Section 3 to familiarize yourself with the
various control functions. Once you have read and fully understand Section 3, please fol-
low the steps below precisely in order to prevent equipment damage or malfunction.
4 - 1 Proper Control Settings for Check-Out
1.
Place all switches in the “OFF” position.
2.
Remove Fryer lid.
3.
Remove the baskets or other accessory items from the fry-kettle.
4.
Turn on the circuit breaker which supplies power to the unit.
5.
Place the fryer’s main Power Switch to “ON”. The green power light should be illuminated. If the power
light fails to illuminate, refer to the appropriate section of the troubleshooting guide. If the green power
light illuminates, proceed to the next step.
4 - 2 Operational Check of Heating Elements
This step is designed to ensure your fryer’s heating elements are functioning.
WARNING
DO NOT touch the heating elements during this portion of the check-out. The heating
elements are very hot and skin contact with them may result in severe burns.
1.
Wipe the dry cool heating elements with a wet sponge.
CAUTION
This portion of the check-out requires the elements be activated. DO NOT operate the
elements for more than 10 seconds without them being fully covered by shortening.
Failure to observe this precaution may result in damage to the heating elements.
2.
With the fryer’s lid removed, briefly turn the Selector Switch to the COOK position (max. 10 sec.). Then
return it to the OFF position.
!
!
!
Содержание Chester Fried CF 400
Страница 10: ...7 Operating Instructions ...
Страница 16: ...13 Fryer Components and Their Function Cooking Vessel Figure 3 3 6 2 1 5 4 ...
Страница 29: ...26 Preparing the Fryer for Operation Filter Pan Shown with Drain Hose Attached Figure 7 ...
Страница 39: ...36 Preparing the Fryer for Operation Figure 11 VH Series ...
Страница 43: ...40 Upper Rear Panel Removed Showing Location of Fire Suppression System Figure 12 Fire Suppression System ...
Страница 46: ...43 Fire Suppression System 6 6 Illustrations Fire Suppression Plumbing Diagram ...
Страница 48: ...45 Fire Suppression System 6 6 Illustrations Fusible Link Conduit Diagram ...
Страница 50: ...47 Fire Suppression System 6 6 Illustrations Manual Pull Conduit Diagram ...
Страница 52: ...49 Fire Suppression System 6 6 Illustrations Fire Suppression Conduit Diagram ...
Страница 68: ...65 Wiring Model CF 400 500 1 phase 10 2 Wiring Diagram NOTE UNLESS OTHERWISE NOTED ALL WIRES ARE 18 GAUGE ...
Страница 70: ...67 Wiring Model CF 400 500 3 phase 10 4 Wiring Diagram NOTE UNLESS OTHERWISE NOTED ALL WIRES ARE 18 GAUGE ...
Страница 72: ...69 Wiring Model CF 400 VH 1 phase 10 6 Wiring Diagram NOTE UNLESS OTHERWISE NOTED ALL WIRES ARE 18 GAUGE ...
Страница 74: ...71 Wiring Model CF 400 VH 3 phase 10 8 Wiring Diagram NOTE UNLESS OTHERWISE NOTED ALL WIRES ARE 18 GAUGE ...
Страница 76: ...73 Wiring Model CF 500 VH 1 phase 10 10 Wiring Diagram NOTE UNLESS OTHERWISE NOTED ALL WIRES ARE 18 GAUGE ...
Страница 78: ...75 Wiring Model CF 500 VH 3 phase 10 12 Wiring Diagram NOTE UNLESS OTHERWISE NOTED ALL WIRES ARE 18 GAUGE ...
Страница 79: ...76 Wiring Model CF 400 500 1 3 Phase 10 13 Wiring Schematic ...