Installing Dish
Installing Equipment
36
CPE Installation and Pointing
Proprietary and Confidential
2.
Connect the other end of the equipotential bonding cable to the pole clamp using
the screw provided.
Figure 28: Grounding BUC to Pole Clamp
3.
Ground the pole supporting the dish assembly according to local regulations.
Grounding can be done by attaching a down-conductor to the grounding screw of
the back bracket (as shown in the image above) with a 6.5mm ring-terminal (not
provided with this kit).
Setting Nominal Skew
To set the skew value:
1.
Rotate the back bracket-reflector assembly around the Az/EL-skew plate assembly
to set the skew value as indicated in the invoice.
Содержание SkyEdge IIc
Страница 1: ...CPE Installation and Pointing User Guide July 2013 Revision Number 1 1 Document Number DC 002966 D...
Страница 6: ......
Страница 12: ......
Страница 22: ......
Страница 68: ......
Страница 74: ......
Страница 84: ...82 CPE Installation and Pointing Proprietary and Confidential Figure 67 Mounting LNBF Adapter onto LNBF Bracket...