Installing Dish
July, 2013
27
Proprietary and Confidential
Figure 14: Retention Nuts
2.
Verify that the two nuts retaining the Az/El horizontally movable part (marked with
smaller circles) are loose.
3.
Rotate the elevation screw to set the nominal elevation value as indicated in the
invoice.
Figure 15: Elevation Screw
Содержание SkyEdge IIc
Страница 1: ...CPE Installation and Pointing User Guide July 2013 Revision Number 1 1 Document Number DC 002966 D...
Страница 6: ......
Страница 12: ......
Страница 22: ......
Страница 68: ......
Страница 74: ......
Страница 84: ...82 CPE Installation and Pointing Proprietary and Confidential Figure 67 Mounting LNBF Adapter onto LNBF Bracket...