Installing Pole
Installing Equipment
22
CPE Installation and Pointing
Proprietary and Confidential
Figure 9: Unsuitable Location 2
For information on how to select dish location using a smartphone application, refer to
Dish Pointing Smartphone Applications (on page
65
).
Installing Pole
When installing the pole for the dish, follow these guidelines:
The pole diameter must be between 45 and 70 mm.
The pole must be installed on a solid base.
Mechanical forces to be considered:
The wind load of the dish is 495 N at pressure of 800 N/m
2
according to EN
60728-11.
The maximum bending moment of the mounting mast (1000mm high) at the fixing
point is 495 NM.
The rotational stiffness of the dish mount shall be better than 0.02° at operational
wind speed of 70 km/h.
Installing Dish
Bring the kit box with its contents to the place where you have installed the pole, and
spread out the components of the dish and transceiver for assembly and outdoor
installation.
Tip: Leave the box containing the modem indoors.
The box is shown in the Figure below.
Содержание SkyEdge IIc
Страница 1: ...CPE Installation and Pointing User Guide July 2013 Revision Number 1 1 Document Number DC 002966 D...
Страница 6: ......
Страница 12: ......
Страница 22: ......
Страница 68: ......
Страница 74: ......
Страница 84: ...82 CPE Installation and Pointing Proprietary and Confidential Figure 67 Mounting LNBF Adapter onto LNBF Bracket...