3 - 16
Z-30/20N • Z-30/20N RJ • Z-34/22 • Z-34/22N
Part No. 139378
Section 3 • Scheduled Maintenance Procedures
June 2011
REV B
CHECKLIST
B
PROCEDURES
B-10
Test the Drive Speed -
Stowed Position
Note: Genie specifications require that this
procedure be performed every 250 hours or
quarterly, whichever comes first.
Proper drive function movement is essential to
safe machine operation. The drive function should
respond quickly and smoothly to operator control.
Drive performance should also be free of
hesitation, jerking and unusual noise over the
entire proportionally controlled speed range.
1 Select a test area that is firm, level and free of
obstructions.
2 Create start and finish lines by marking two
lines on the ground 40 feet / 12.2 m apart.
3 Turn the key switch to platform control and pull
out the red Emergency Stop button to the on
position at both the ground and platform
controls.
4 Choose a reference point on the machine; i.e.,
contact patch of a tire, as a visual reference for
use when crossing the start and finish lines.
5 Bring the machine to maximum drive speed
before reaching the start line. Begin timing
when your reference point on the machine
crosses the start line.
6 Continue at full speed and note the time when
your machine reference point passes over the
finish line. Refer to Section 2,
Specifications.
B-11
Test the Drive Speed -
Raised or Extended Position
Note: Genie specifications require that this
procedure be performed every 250 hours or
quarterly, whichever comes first.
Proper drive function movement is essential to
safe machine operation. The drive function should
respond quickly and smoothly to operator control.
Drive performance should also be free of
hesitation, jerking and unusual noise over the
entire proportionally controlled speed range.
1 Select a test area that is firm, level and free of
obstructions.
2 Create start and finish lines by marking two
lines on the ground 40 feet / 12.2 m apart.
3 Raise the primary boom more than
5 feet / 1.5 m.
4 Choose a reference point on the machine; i.e.,
contact patch of a tire, as a visual reference for
use when crossing the start and finish lines.
5 Bring the machine to maximum drive speed
before reaching the start line. Begin timing
when your reference point on the machine
crosses the start line.
6 Continue at full speed and note the time when
your machine reference point passes over the
finish line. Refer to Section 2,
Specifications.
Содержание Z-30/20N
Страница 1: ......
Страница 4: ...Z 30 20N Z 30 20N RJ Z 34 22 Z 34 22N PartNo 139378 June2011 iv This page intentionally left blank...
Страница 148: ...6 46 June2011 Section 6 Schematics 6 45 Power Cable Wiring Diagram...
Страница 149: ...6 47 Section 6 Schematics June2011 6 48 Drive Contactor Panel Wiring Diagram...
Страница 152: ...6 50 June2011 Section 6 Schematics Manifold and Limit Switch Wiring Diagram 6 49...
Страница 153: ...6 51 Section 6 Schematics June2011 6 52 LVI BCI Option Wiring Diagram...
Страница 156: ...6 54 June2011 Section 6 Schematics 6 53 Charger Interlock Option...
Страница 157: ...6 55 Section 6 Schematics June2011 6 56 CTE Option CE Models...
Страница 160: ...6 58 June2011 Section 6 Schematics Hydraulic Schematic 6 57...