GEMÜ R563
13 Operation
13 Operation
13.1 Initialization
NOTICE
▶
Initialization should be carried out in a depressurized
condition (initialization force = 1/2 nominal force). For
initialization under operating pressure, the initialization
force (IO-Link index 0x90 – subindex 3 – Force initializa-
tion) must be adapted.
Initialization must be carried out in the following situations:
–
Retrofitting an electrical position indicator
–
Replacing the actuator
–
Replacing the diaphragm
Initialization is already carried out for the process valve
which was fully mounted in the factory.
Initialization can be carried out using the following proced-
ures:
–
On-site initialization
–
Initialization via IO-Link
–
Initialization via configurable digital input (digital in-
put must be set to "Init")
13.1.1 On-site initialization of the end positions
1
1. Connect supply voltage.
2. Hold the magnet briefly (>100 ms) at the point on the
housing cover marked with PROG
1
.
ð
OPEN and CLOSED LEDs flash alternately.
3. Valve automatically moves into the OPEN position.
4. Valve automatically moves into the CLOSED position.
5. Initialization mode is automatically ended.
6. The end positions are set.
13.1.2 Initialization of the end positions via IO-Link
1. Briefly activate (>100 ms) initialization mode (process
data "Selection of operating mode").
ð
OPEN and CLOSED LEDs flash alternately.
2. Valve automatically moves into the OPEN position.
3. Valve automatically moves into the CLOSED position.
4. Initialization mode is automatically ended.
5. The end positions are set.
13.2 Manual override
Open, actuate and close the manual override with the
hexagon socket (SW3).
1
2
1. Unscrew sealing plug
2
anti-clockwise out of cover
1
and
remove it.
3
OPEN
CLOSED
2. Operate the manual override
3
with the hexagon socket
(WAF3).
ð
Turn clockwise to close the valve.
ð
Turn anticlockwise to open the valve.