![GEA Niro Soavi One7TS Скачать руководство пользователя страница 200](http://html1.mh-extra.com/html/gea/niro-soavi-one7ts/niro-soavi-one7ts_instruction-manual_572298200.webp)
Instructions for use and maintenance
This manual is owned by GEA Niro Soavi Any reproduction, even partial, is prohibited.
07C100-7C0
GEA Niro Soavi
198
SHEET L[c]
DRIVE -
Check V-belt wear and renew if necessary
CAUTION:
Activities to be carried out after maintenance shutdown of the machine (see paragraph 7.3.3)
RESOURCES AND TOOLS
: MAINTENANCE ENGINEER
JOB FREQUENCY
: EVERY 1500 HOURS
(check)
+ IN THE EVENT
OF DAMAGE
(renewal)
TIME REQUIRED
: 30 MINUTES
GENERAL INFORMATION
Worn pulleys considerably reduce the service life of the belts, which can get to touch the bottom of
the groove causing slipping that produces wear and surface burns.
FIG. 7-45
If the sides of the groove are recessed there is no longer uniform contact between the side of the belt
and the pulley, whose bottom causes wear of the bottom edge of the belt causing it to break early.
It is therefore necessary to check the state of wear of the pulleys and remove any rust, grease or oil
that there may be.
Содержание Niro Soavi One7TS
Страница 2: ......