Initial commissioning
Initial commissioning checklist
2018-9015-003
03-2015
General
DONE
N/A
The owner received the instruction manual from the dealer and commits to read it.
The owner is instructed by the dealer on how to operate and maintain the product.
The spreader is connected to the tractor and secured with safety chains.
The safety guards and safety labels are installed.
The signal indicators and signal lights are operational.
The lubrication points are lubricated.
The oil levels are adequate.
All bolts are torqued.
All drains are closed.
All connections are secured.
A visual inspection is performed to ensure there are no leaks, signs of distortion or defective parts.
The wheels nuts are tightened to correct torque.
The tires are inflated to appropriate pressure.
The owner is instructed on the turning radius of this product.
The tractor draw bar is adjusted to minimum length while respecting the PTO limitations.
The spreader impeller matches the tractor RPM.
The PTO shaft is installed.
The owner is instructed on the PTO driveline instructions.
The spare safety shear bolts are removed from the PTO guards.
The anti-siphon is in the upright position.