2-6 VersaMax Modules, Power Supplies and CarriersUser Manual
GFK-1504N
2
DIN Rail Installation Steps
VersaMax CPUs, Network Interface Unit (NIU) modules, Expansion Receiver
(ERM) modules, and module carriers snap easily onto the DIN rail. No tools are
required for mounting or grounding to the DIN rail.
Before joining module carriers to a CPU, NIU, or ERM, remove the connector
cover on the right-hand side of the CPU, NIU, or ERM. Do not discard this
cover. You will need to install it on the last carrier.
Connector Cover
Slide carriers along the DIN rail to engage the connectors in the sides of
adjacent carriers. To avoid damaging connector pins, do not force or slam
carriers together.
Install the connector cover that was removed over the connector on the last
carrier to protect the connector pins and to provide compliance with standards.
Connector Cover