Document Changes
Version/Date
Changes
H/12-2010
Changes ES-699 doc to Rev N. See Appendix A
J/3-11
Changes ES-699 doc to Rev P. See Appendix A
K/12-2011
Added description and procedures relevant to introduction of the high
throughput version. ES-699 updated.
L/10-2012
Changed the specifications to reflect single acting supply pressure of up
to 100 and double-acting up to 150 psi.
Entered edits from Sandro Esposito and Stephane Leledy.
M/09-2013
Added the Load Limits sections and a cross reference to it from the wiring
installation.
Updated ES-699 to Rev. Y.
N/10-2015
Updated the Load Limits section.
Updated ES-699 to Rev. AA.
Updated Disclaimer statement.
Added information on position retransmit switches.
Removed Remote Positioner Installation.
© 2015 General Electric Company. All rights reserved
.
Masoneilan SVI II AP Digital Positioner Quick Start Guide
|
5
Содержание SVI II AP
Страница 6: ...Page Left Blank Intentionally ...
Страница 10: ...This page intentionally left blank ...
Страница 58: ...This page intentionally left blank ...
Страница 84: ... 2015 General Electric Company All rights reserved 84 GE Oil Gas ...
Страница 85: ...Masoneilan SVI II AP Digital Positioner Quick Start Guide 85 2015 General Electric Company All rights reserved ...
Страница 90: ...This page intentionally left blank ...
Страница 91: ......