© 2015 General Electric Company. All rights reserved
.
30 |
=
GE Oil & Gas
Installing the SVI II AP for Double- Acting Operation
This section explains how to mount the SVI II AP for the 84/85/86 kit for double-acting valve po-
sitioner configurations.
To mount the kit:
1. Set valve to the closed position.
2. Install the mounting assembly to the yoke (Figure 14) using helical spring washer
5/16, flat washer 5/16 and hex screw 5/16-18x44.5 [1.75] LG.
Figure 14
84/85/86 Actuator
NOTE
Mount all components snug enough to stay in place but loose
enough to tap with rubber hammer into final position.
Lever
Rod-end
Kit Mount
Bracket
Содержание SVI II AP
Страница 6: ...Page Left Blank Intentionally ...
Страница 10: ...This page intentionally left blank ...
Страница 58: ...This page intentionally left blank ...
Страница 84: ... 2015 General Electric Company All rights reserved 84 GE Oil Gas ...
Страница 85: ...Masoneilan SVI II AP Digital Positioner Quick Start Guide 85 2015 General Electric Company All rights reserved ...
Страница 90: ...This page intentionally left blank ...
Страница 91: ......