© 2015 General Electric Company. All rights reserved
.
32 |
=
GE Oil & Gas
5. Ensure the turnbuckle assembly is parallel to the stem and the magnets are in the
valve closed position (Figure 17) and connect to take-off bracket.
Figure 17
Magnet Position with Valve Closed
6. Verify lever is in correct position with valve closed. Adjust rod-ends, if necessary.
Figure 18
Lever Alignment
7. Mount the SVI-II with M6-1 screws.
8. Cycle the valve open to close verifying proper components movement and that
rod-ends move free and clear from other components.
Содержание SVI II AP
Страница 6: ...Page Left Blank Intentionally ...
Страница 10: ...This page intentionally left blank ...
Страница 58: ...This page intentionally left blank ...
Страница 84: ... 2015 General Electric Company All rights reserved 84 GE Oil Gas ...
Страница 85: ...Masoneilan SVI II AP Digital Positioner Quick Start Guide 85 2015 General Electric Company All rights reserved ...
Страница 90: ...This page intentionally left blank ...
Страница 91: ......