Masoneilan SVI II AP Digital Positioner Quick Start Guide
=
|
39
© 2015 General Electric Company. All rights reserved
.
Overview
This section provides the calibration procedures to ensure proper valve positioning. Operational
checkout, configuration and calibration procedures are described using an SVI II AP that has a
display with pushbuttons.
Perform all procedures in this section before putting
the SVI II AP into operation.
Check Out Procedures
SVI II AP checkout consists of physical and operational checkout procedures. The physical check-
out procedures include:
“Inspecting Actuator, Linkages, or Rotary Adapter” on page
40
“Verifying Mounting and Linkage Adjustment” on page
40
“Checking the Magnet” on page
40
“Checking the Air Supply” on page
42
“Checking the Electronic Module Connections” on page
42
NOTE
3. Check Out,
Configuration and
Calibration
Содержание SVI II AP
Страница 6: ...Page Left Blank Intentionally ...
Страница 10: ...This page intentionally left blank ...
Страница 58: ...This page intentionally left blank ...
Страница 84: ... 2015 General Electric Company All rights reserved 84 GE Oil Gas ...
Страница 85: ...Masoneilan SVI II AP Digital Positioner Quick Start Guide 85 2015 General Electric Company All rights reserved ...
Страница 90: ...This page intentionally left blank ...
Страница 91: ......